Similar Projects
Lake Bowen - Stormwater Outfalls
Infrastructure
Bidding
$200,000 CJ est. value
Spartanburg, SC 29306

Lyndon Drive Stormwater Repair
Infrastructure
Bidding
$500,000 CJ est. value
Lancaster, SC 29720

Provide Removal and Replacement for Backflow Device
Renovation
Sub-Bidding
$170,000 CJ est. value
Florence, SC 29506

Pump Station Protective Measure Standby Pump Installation
Renovation
Sub-Bidding
$275,000 CJ est. value
Myrtle Beach, SC 29577

Plumbing Contractor Services - Indefinite Delivery Contract (IDC)
Term Contract
Post-Bid
SC

Material and Labor for Plumbing Work - As Needed
Term Contract
Post-Bid
Florence, SC

Provide/Install Water Bottle Stations
Alteration
Results
Anderson, SC

Install Bottle Fill Fountains
Alteration
Results
Anderson, SC

Murray-La Saine Montessori School New Traffic Stacking Loop
Infrastructure
Bidding
$300,000 CJ est. value
Charleston, SC 29412

Water Transmission Main Protective Measures Pressure Reducing Valve Installation
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Myrtle Beach, SC 29577

Plumbing Services
Alteration
Post-Bid
Goose Creek, SC 29445

Standpipe Replacement Project
Infrastructure, Alteration
Results
$2,000,000 est. value
Lugoff, SC 29078

Sewer Force Main Valve Replacement
Infrastructure
Bidding
$4,000,000 CJ est. value
Myrtle Beach, SC 29577

Plumbing Services IDC
Alteration
Post-Bid
Beaufort, SC

Plumbing Maintenance and Repairs Services
Alteration
Results
Spartanburg, SC

Last Updated 01/09/2023 01:03 PM
Project Title

2022 WRRF VFD Replacement

Physical Address View project details and contacts
City, State (County) Greenville, SC 29601   (Greenville County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,090,584 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the replacement of 43 variable frequency drives (VFDs) located at six (6) Water Resource Recovery Facilities (Georges Creek, Gilder Creek, Lower Reedy, Mauldin Road, Pelham, and Piedmont Regional). The existing VFDs are installed on motors ranging in size from 8-HP to 75-HP. Liquidated Damages $500/day Project Duration 480 days Bid Bond 5.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 11/22/2022 5:00 PM (EST)

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents