Similar Projects
Water System Hydraulic Model
Bidding
Boston, MA

Furnish and Deliver Water Meters
Bidding
$350,000 est. value
Needham, MA

Fire Alarm and Sprinkler System Maintenance and Repair Services
Post-Bid
Less than $202,500 est. value
Brookline, MA

Installation of 6-Inch to 10-Inch Cement Lined Ductile Iron Water Mains
Post-Bid
Less than $1,400,000 est. value
Plainville, MA 02762

Canton Street Water Main
Results
Less than $1,200,000 est. value
Dedham, MA

Miscellaneous Water and Sewer Supplies
Term Contract
Results
Less than $300,000 est. value
Needham, MA

Low Service Pressure Reducing Valve Improvements
Bidding
$11,200,000 est. value
Boston, MA

Washington Street and Bugbee Street Water Main Improvements
Post-Bid
Plainville, MA 02762

2020 Water Main Improvements Contract 1
Results
Less than $3,800,000 est. value
Canton, MA

Replacement of Lead Services
Bidding
$999,437 est. value
Boston, MA

Holliston and Brentwood Street Water Main Improvements - Contract 2
Post-Bid
Less than $2,600,000 est. value
Medway, MA 02053

Lincoln Street Waterline Improvements
Results
Less than $1,292,535 est. value
Franklin, MA 02038

Renewing Approximately 60 Water Services
Bidding
Less than $700,000 est. value
Bellingham, MA

Holliston and Brentwood Street Water Main Improvements - Contract 1
Post-Bid
Less than $3,200,000 est. value
Medway, MA 02053

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 11/27/2019 03:33 PM
Project Title

Water Shut-Off Valves Replacement

Physical Address View project details and contacts
City, State (County) Wellesley, MA 02481   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replace worn out domestic hot and cold water shut-off valves, and drain valves on each unit riser, and new shut-off valves at each building horizontal main, all of which are accessible from the crawl spaces in each building, an d coordination with Wellesley DPW and WHA for a temporary water shut down.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents