Similar Projects
Lander High Pressure Water System Upgrades - Phase III
Infrastructure
Results
$7,763,502 est. value
Lander, WY

Project Manual for Fremont County Solid Waste Disposal District Scalehouse Construction
New Construction, Infrastructure
Post-Bid
$320,000 CJ est. value
Lander, WY 82520

RIW 053-054 Taxiway A, C1, and D Rehabilitation Rebid
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Riverton, WY 82501

RFP Construction Manager - Riverton High School Auditorium
New Construction, Infrastructure - 12,924 SF
Bidding
$8,200,000 CJ est. value
Riverton, WY 82501

Riverton Taco John's Remodel
Addition, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Riverton, WY 82501

Ft. Washakie Health Center Optometry Clinic Remodel
Infrastructure, Build-out
Bidding
$5,000,000 CJ est. value
Fort Washakie, WY 82514

Riverton Streets (Little Wind River Pedestrian Bridge)
Infrastructure
Post-Bid
$1,996,880 CJ est. value
Riverton, WY 82501

RFP Construction Manager at Risk - Hospital and Clinic With Associated Site Development
New Construction, Infrastructure - 70,000 SF
Post-Bid
$35,000,000 CJ est. value
Riverton, WY 82501

Waltman to Shoshoni US 20/26 - N342054 - Fremont County
Infrastructure
Conception
$4,270,000 CJ est. value
Shoshoni, WY 82649

Lander to Sinks Canyon Wyoming 131 - 0701005 - Fremont County
Infrastructure
Conception
$3,291,000 CJ est. value
Lander, WY 82520

Dubois - Diversion Dam (Diversion Dam Rest Area)
Infrastructure
Results
$291,756 CJ est. value
Ethete, WY 82510

Wyoming Central Canal Streambank Project
Infrastructure
Bidding
$625,000 CJ est. value
Ethete, WY 82510

RVID Streambank and Canal Reclamation Project
Infrastructure
Bidding
$625,000 CJ est. value
Riverton, WY 82501

Muddy Gap - Lander / Lyons Valley
Infrastructure
Bidding
$500,000 CJ est. value
Ethete, WY 82510

Northern Arapaho Tribal Center Addition Remodel
Addition, Demolition, Build-out, Infrastructure
Bidding
$140,000 CJ est. value
Ethete, WY 82520

Last Updated 09/28/2022 07:36 AM
Project Title

Arapahoe Water Supply Phase II Transmission Mains - Tank to 17 Mile Project

Physical Address View project details and contacts
City, State (County) Arapahoe, WY 82501   (Fremont County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of approximately 4,400 lineal feet of 12" water transmission line and associated work in the community of Arapahoe, WY. Site Directions: Construction of approximately 4,400 LF of 12" O PVC Water line and all associated work along the east side of Left Hand Ditch Road between the 1 MG water storage tank and 17 Mile Road in Arapahoe, WY.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents