Similar Projects
Trailside at Everett Park Phase II
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
South Haven, MI 49090

I-94 Interchange Rebuild - Michigan Department of Transportation
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Paw Paw, MI 49079

Paw Paw Public Schools 2022 Bond - High School Multipurpose Space
Addition, Demolition, Infrastructure
Design
$8,640,000 CJ est. value
Paw Paw, MI 49079

Paw Paw Public Schools 2022 Bond - High School Cafeteria Addition
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Paw Paw, MI 49079

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Hot mix asphalt cold milling and resurfacing, full depth concrete pavement detail 7 and 8 joint repairs, sidewalk ramp upgrades and pavement markings on M-140/1-196BL
Infrastructure
Bidding
$4,389,000 CJ est. value
South Haven, MI 49090

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

2020/2021 Winter Snowplowing
Infrastructure
Post-Bid
Hartford, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Lake Ottawa & Black River Campground Road Reconstruction
Term Contract
Results
$500,000 to $1,000,000 est. value

Overton Redevelopment Project - City of South Haven
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
South Haven, MI 49090

Paw Paw Early Elementary School - 2022 Bond - Paw Paw Public Schools
Addition, Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Paw Paw, MI 49079

Paw Paw Public Schools 2022 Bond - High School New Stadium
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Paw Paw, MI 49079

Fire Lane 14: Driveway Improvements
Term Contract, Alteration
Post-Bid
Covert, MI 49043

Porter Township Subdivisions; Ultra-Thin Overlay
Infrastructure
Results
Lawrence, MI

Last Updated 12/19/2022 03:06 PM
Project Title

County Road 380 from County Road 665 to Bloomindale/Columbia Twp Line

Physical Address View project details and contacts
City, State (County) Bloomingdale, MI 49026   (Van Buren County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $376,224 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Geneva Township; remove existing culvert, install new culvert and catch basin, make required drainage improvements CR380 from CR665 to Bloomingdale/Columbia Township line, Bloomingdale Township; top pave with gravel shoulders Burgess Road from 82nd Avenue to 38th Street, Decatur Township; top pave with gravel shoulders CR352 from CR687 to 60th Street, Keeler Township; tree removals, HMA base crushing and shaping, trench, widen and drainage improvements, HMA leveling and top course pave CR388 from 29th Street to CR653 South, Pine Grove Township; tree removals. The Road Commission reserves the right to reject any or all bids, to waive irregularities in the bidding, and to award the contract in any manner deemed to be in the best interest of the Van Buren County Road Commission.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents