Similar Projects
Landscape Maintenance Services Bagdouma Park
Term Contract
Sub-Bidding
Coachella, CA 92236

Landscape Maintenance Services Bagdouma Park
Term Contract
Sub-Bidding
Coachella, CA 92236

S208--Pacific District Consolidated Grounds Maintenance Requirement
Term Contract
Post-Bid
Arvin, Dixon, Gustine, Los Angeles, Riverside, San Bruno, San Diego, San Francisco, CA - Santa Fe, Silver City, NM - Eagle Point, Happy Valley, Roseburg, OR - Kent, Seattle, WA 93203

Yardney Filtration System Service
Infrastructure
Post-Bid
March Air Reserve Base, CA 92518

Lawn Maintenance Service
Term Contract
Results
Moreno Valley, CA 92551

Landscape Maintenance Area No. 17
Term Contract
Results
Palm Desert, CA

Weed Abatement Services
Alteration
Post-Bid

Rock Blanket, Rock Mulch, and Plant Establishment Work
Infrastructure
Results
$1,000,000 est. value
Banning, CA 92220

Landscaping Maintenance Areas 01 & 05 in the City of Corona
Term Contract
Post-Bid
$500 est. value
Corona, CA 92882

Irrigation Lateral 119.64-7.5 Replacement Project - Phase 1
Infrastructure, Alteration
Results
$2,900,000 est. value
Palm Desert, CA

Desert Highland Ball Field Project
Renovation, Alteration
Post-Bid
$50,000 est. value
Palm Springs, CA 92262

Harada Heritage Park Ballfield Irrigation and Sod Installation Project
Alteration
Results
$2,000,000 est. value
Corona, CA 92880

One-Time Landscape Cleanup and Landscape Maintenance Service at the Montebello DMV Field Office
Term Contract
Post-Bid

Unit Cost for Turf Renovation
Alteration
Results
$850,000 est. value
San Jacinto, CA

Habitat and Invasive Species Services
Term Contract
Post-Bid
Less than $98,500,000 est. value

Last Updated 04/05/2023 05:12 PM
Project Title

French Valley Recycled Water Retrofit Project Phase 3

Physical Address View project details and contacts
City, State (County) Winchester, CA 92596   (Riverside County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping, Landscaping/Irrigation
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,870,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work Will Primarily Consist of Furnishing All Labor, Equipment and Materials Necessary for Recycled Water on-site Retrofits to Convert Irrigation Systems Currently Using Potable Water to Recycled Water as Shown in the Drawings and Specifications. Questions: All Questions Must Be Submitted in Writing by 5:00 P.m. On Tuesday, March 28th , 2023, to Justin Schweitzer at Justin@gorecreation.org or Fax: 951-654-5279. Questions Received After This Time May Not Be Responded to. EMWD Engineers Estimate: $1,870,000 Guarantee: Bids Must Be Accompanied by Cash, a Certified or Cashier S Check or a Bid Bond in Favor of the Valley-wide Recreation and Park District in an Amount Not Less Than Ten Percent (10%) of the Submitted Total Bid Price, as a Guarantee That the Bidder Will Enter Into the Contract for the Work, the Full Amount of Such Guarantee to Be Forfeited to the District Should Successful Bidder Fail to Enter Into Said Contract as Set Forth in Section 20160 Et Seq. Of the Public Contract Code of the State of California. Security: Each Bid Shall Be Accompanied by the Security Referred to in the Contract Documents, the Non-collusion Affidavit, the List of Proposed Subcontractor, and All Additional Documentation Required by the Instructions to Bidders. The Successful Bidder Will Be Required to Furnish the District With a Performance Bond Equal to 100% of the Successful Bid, and Payment Bond Equal to 100% of the Successful Bid, Prior to Execution of the Contract. All Bonds Are to Be Obtained From a Surety That Meets All the State of California Bonding Requirements, as Defined in Code of Civil Procedure Section 995.120, and is Admitted by the State of California. Pursuant of Public Contract Code Section 22300, the Successful Bidder May Substitute Certain Securities for Funds Withheld by District to Ensure His Performance Under the Contract. Contract Time: No Bid or Bid Security May Be Withdrawn for Seventy-five (75) Calendar Days After the Date Bids Are Received. The Successful Bidder Shall Within Ten (10) Calendar Days After the District Mails a Notice of Acceptance of Bid, Return the Signed Contract and Bonds, and Attend the Pre-construction Conference at the District S Administration Office. The Contract Period Shall Commence Twenty (20) Calendar Days From the Date of the Notice to Proceed. The Contractor Shall Complete All Work Including Testing, Within One Hundred Eighty (180) Calendar Days. Additional Information: All Inquiries Shall Be Directed to James Salvador a T Justin@gorecreation.org or at (951) 654-1505.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents