Similar Projects
Elkhorn River Bank Stabilization - City of Scribner and Dodge County
Infrastructure
Conception
$1,000,000 CJ est. value
Scribner, NE 68057

Ritz Lake - Phase II
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fremont, NE 68025

Ritz Lake - Phase II
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fremont, NE 68025

Deer Pointe Elementary Site Package Project
Infrastructure
Bidding
$600,000 CJ est. value
Fremont, NE 68025

Sanitary Sewer Repair - 2023
Infrastructure
Bidding
$800,000 CJ est. value
Fremont, NE 68025

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Ridge Drive Reconstruction
Infrastructure
Post-Bid
$300,000 est. value
Hooper, NE 68031

Concrete Pavement, Bridges -US-275, Scribner North and South
Infrastructure
Results
$20,000,000 to $100,000,000 est. value
NE

Rawhide Creek Trail, Fremont
Infrastructure
Results
Less than $5,000,000 est. value
NE

Logan View Public Schools Elementary Addition
Addition, Demolition, Infrastructure
Construction
$2,219,000 CJ est. value
Hooper, NE 68031

Keene Memorial Library Renovation - Bid Package 1
Addition, Renovation, Infrastructure - 34,340 SF
Construction
$6,200,000 CJ est. value
Fremont, NE 68025

Highway 77 Self-Storage
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Inglewood, NE 68025

2023 Pavement Rehabilitation
Infrastructure
Bidding
$400,000 CJ est. value
Fremont, NE 68025

Paving Reconstruction
Infrastructure
Post-Bid
$300,000 est. value
Scribner, NE

West 16th Street Asphalt Overlay
Infrastructure
Results
$400,000 est. value
Fremont, NE 68025

Last Updated 01/31/2023 11:34 PM
Project Title

Elk Street Improvements Spring to Cedar

Physical Address View project details and contacts
City, State (County) Hooper, NE 68031   (Dodge County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $897,610 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all equipment, labor, materials and appurtenances required to construct approximately 653 LF of 8" water main, 520 LF of 10" sewer, 2493 SY of Portland cement concrete pavement and other such work as may be incidental to ELK STREET IMPROVEMENTS. Budget: 400-500k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents