Similar Projects
Marion Street Waterline Replacement Project and Interconnect / Watertank RTU System
Infrastructure
Bidding
$170,000 est. value
Pittsburgh, PA 15219

Meter Vault Expansion - Nadine Pump Station
Infrastructure
Bidding
$400,000 est. value
Verona, PA 15147

Waterline Replacement Project for Sardis Road - Phase 1
Post-Bid
Pittsburgh, PA

Plastic Pipe
Post-Bid
Carnegie, PA

Installation of 485` of 6" C900, DR14, PVC along Ruffner Lane
Results
Sewickley, PA 15143

Polyvinyl Chloride Water Pipe (PVC)
Results
Sewickley, PA 15143

Bakerstown Culmerville Road WaterLine Extension
Infrastructure
Bidding
$325,000 est. value
PA

Wall Avenue Waterline Replacement
Post-Bid
Pittsburgh, PA

J045--Chilled Water Valve Replacement
Results
Pittsburgh, PA 15240

Megalugs for Ductile Iron with Gaskets
Post-Bid
Oakdale, PA

H247--Snow Melt Leak Detection Pittsburgh VAMC
Results
Pittsburgh, PA 15240

1860 West Street Utilities and Site Package 1
Post-Bid
Munhall, PA 15120

Middle Avenue Waterline Replacement
Results
Less than $500,000 est. value
Wilmerding, PA 15148

Nebraska Avenue Waterline Replacement - Neville Township
Post-Bid
Pittsburgh, PA 15225

Installation of 495` of 6" C900, DR14, PVC pipe along Twin Hill Road Extension, Town of McCandless
Results
PA 15090

Last Updated 06/24/2022 03:39 PM
Project Title

Sardis Road - Phase 2 Waterline Replacement

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15239   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will encompass but not be limited to the following scope of work: 1. Installation of approximately 4,840' new 12" PVC-C900 Waterline. All PVC Watermain pipe will be purchased by the PBMA and stored at the authority office (4555 New Texas Road) prior to start of work. Contractor will be responsible for the purchasing and installation of all other materials included in the project. 2. Replacement of Service lines, curb stops and corporation stops and associated valves and fittings. 3. New Inter-Connections at Existing Locations. 4. Installation of new fire hydrants and associated valves and mechanical fittings. Removal of abandoned fire hydrant as directed by the engineer. 5. Restoration of all disturbed areas, including fences, walls, steps, sidewalks, lawns. Replacement of disturbed signs and mailboxes. 6. All roadway/pavement restoration. 7. Erosion and Sedimentation Controls. 8. Traffic control during construction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents