Similar Projects
Last Updated | 05/26/2021 09:38 AM |
Project Title | Paving |
Physical Address | View project details and contacts |
City, State (County) | Mendon, VT (Rutland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $131,700 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Town reserves the right to accept or reject any or all bids. 2. All streets to be paved shall be swept within 24 hours prior to paving. 3. A bonding emulsion shall be sprayed evenly across the street on existing or milled areas to be paved and no more than 30 minutes ahead of the paver. 4. Contractors to provide signs and traffic control in accordance with the MUTCD. 5. Traffic flow to be maintained as practical. 6. Pavement thickness listed per street. An apron 12” wide minimum will be paved in front of all driveways except those paved driveways that slope away from the roadway and will need a wider apron. This apron work to be included in the bid price. The Road Commissioner has final say on all apron work. 7. Paving to be completed no later than October 10, 2021 unless specified differently in the street list. A penalty of $500 per day for every day after the deadline will be assessed to the contractor until the job is completed. 8. Contractor to report daily to Road Commissioner total tons of asphalt spread to date by street. 9. Lap Joints: A strip 1” deep minimum and 36” wide minimum shall be cold planed the width of the road way or at intersections where needed to avoid lap joints. Grindings shall be removed by the contractor from the job site or used as shoulder material if needed. 10. Road Commissioner shall be notified when paving is being done. 11. Paving bid to be by the ton in place and submitted on the form provided. Minimum quantities of asphalt per street are listed on the attached sheet. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |