Similar Projects
2020 Provo City Sidewalk Replacement Project
Post-Bid
Provo, UT

2020 Geneva Park Parking Lot Project
Post-Bid
$375,000 to $445,000 est. value
Orem, UT 84057

Historic Utah Southern Rail Trail - via UPRR, Lehi Metropolitan Planning Organization
Results
$500,000 to $1,500,000 est. value
UT

Y--Provo Area Office Parking Lot Replacement
Results
$1,000,000 to $5,000,000 est. value
Provo, UT 84606

Lowe's #2293 - Parking Lot Rehabilitation
Renovation
Post-Bid
Lehi, UT 84043

150 North Street and Improvement Project
Results
Less than $270,905 est. value
Pleasant Grove, UT 84062

2020 Trail Project
Post-Bid
Salem, UT 84653

Poplar Lane Trailhead Parking Lot
Results
Spanish Fork, UT 84660

500 East 600 South Design
Post-Bid
Salem, UT 84653

Utah Lakeshore Trail Hotpots and Amanda Lane Trails
Results
$500,000 to $1,500,000 est. value
UT

Bike-Skills Trails Park Phase 2
Post-Bid
Orem, UT 84057

2021 Provo City Sidewalk Replacement Project
Results
$200,000 to $250,000 est. value
Provo, UT 84606

2020 400 North Mitylite Crosswalk Project
Post-Bid
$30,000 to $350,000 est. value
Orem, UT 84057

800 South Road Improvement Project
Results
Alpine, UT

Parking Lot Improvement Project
Post-Bid
Less than $26,000 est. value
Salem, UT

Last Updated 07/10/2020 03:53 PM
Project Title

Crossroads Boulevard/Lehi Main Street Widening Project

Physical Address View project details and contacts
City, State (County) Lehi, UT 84043   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $13,115,529
Plans Available from Municipal Agency - 03/28/20
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Contract consists of widening and improving Lehi Main Street/Crossroad Blvd between Commerce Drive in Saratoga Springs and 2300 West in Lehi, including adding curb, gutter, and sidewalks, constructing a new bridge across the Jordan River, extending a box culvert at Jordan River Trail, improving and upgrading existing storm drain system, installing and upgrading culinary water lines, installing street lighting and 2 signals, performing some landscaping, and improvements to and creation of wetlands as part of a required wetland mitigation. Additional bid additive items include some aesthetic improvements on the bridge, the improvement to an irrigation line in Saratoga Springs, the improvement of an irrigation line in Lehi, resurfacing of Crossroads Blvd between Commerce Drive and Redwood Road, and additional improvements to a culinary and irrigation waterlines for both Lehi and Saratoga Springs.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents