Similar Projects
Interstate 81 over West Foothills Drive
Infrastructure
Conception
$6,958,544 CJ est. value
Drums, PA 18222

Interstate 81 over West Foothills Drive
Infrastructure
Conception
$6,958,544 CJ est. value
Drums, PA 18222

I-80 EB over I-81 NB/SB
Alteration
Design
$16,152,468 est. value
PA

I-81 NB Grinding Luzerne
Infrastructure
Design
$63,100,799 est. value
Mountain Top, PA 18707

ADA Modification and Site Work to the White Haven Borough Building
Infrastructure, Renovation
Bidding
$16,750 CJ est. value
White Haven, PA 18661

ADA Modification and Site Work to the White Haven Borough Building
Infrastructure, Renovation
Bidding
$16,750 CJ est. value
White Haven, PA 18661

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

CDBG 2019 Project - Street Improvements on Valley View Road
Infrastructure
Post-Bid
Shickshinny, PA

Seal Coat Project
Results
Berwick, PA

2021 Road Improvement Project
Results

New Jersey Central Railroad Train Station Improvement
Renovation - 32,000 SF
Construction
$1,200,000 est. value
Wilkes-Barre, PA 18704

Loomis Roundabout Improvement Project
Construction
Ashley, PA 18701

SR 315 over Reading Blue Mt and Northern Railroad
Infrastructure, Renovation
Conception
$2,950,000 CJ est. value
Pittston, PA 18640

Group 4-15-ST 2
Infrastructure
Design
$5,000,000 est. value
Wapwallopen, PA

2018 FY CDBG Pave Project - Phase 2
Infrastructure
Post-Bid
Exeter, PA

Last Updated 09/16/2022 02:01 PM
Project Title

Field Street Wall Repairs

Physical Address View project details and contacts
City, State (County) Nanticoke, PA 18634   (Luzerne County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $479,955 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the partial demolition of the top of the wall, installation of tie rods, repointing the outside face of the wall, new concrete cap, guiderail and excavation and repaving that portion of Field Street, and all materials, labor and equipment necessary for a complete installation. This is a unit price bid. . Paper sealed bids shall be submitted to the municipality at the above address. Each bid must be accompanied by a certified check or bid bond payable to the Owner in an amount of not less than ten percent (10%) of the bid or bids. Only bonds from companies licensed to do business in the State where the Owner is located will be accepted and the bond shall so state same. There is no pre-bid meeting scheduled, but prospective bidders are urged to familiarize themselves with the site and review the scope of work and construction documents. The limits of work are marked out in white paint. Any contractor who does not do so and submits a bid does so at his own risk. Bids must be submitted unconditionally. No bidder may withdraw bid within SIXTY (60) days after the scheduled closing time for receipt of bids The Owner reserves the right to waive any informality, or to reject any or all bids. PA Labor wage rates apply to this contract. There are no MBE/WBE requirements for this project. Please refer all questions concerning the Bid to Joseph Mullen, P.E., at Pennoni Associates, Inc. via email: jmullen@pennoni.com.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents