Similar Projects
Cobblestone Cay Development
New Construction
Conception
Chesapeake, VA 23320

Scenic Heights
New Construction
Conception
Chesapeake, VA

Crestfield
New Construction
Design
Chesapeake, VA 23320

Elbow Estates
New Construction
Design
Chesapeake, VA 23320

Crestwood Middle School Track Replacement Project
Infrastructure
Bidding
$600,000 CJ est. value
Chesapeake, VA 23320

Demolition of 104 Mill Creek Parkway
Demolition, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Chesapeake, VA 23323

Demolition of 104 Mill Creek Parkway
Demolition, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Chesapeake, VA 23323

Asbestos and Lead Abatement Term Contract
Term Contract
Post-Bid

Annual Environmental Services (Professional Services)
Term Contract
Post-Bid
Chesapeake, VA

Norfolk Harbor Environmental Services IDIQ
Results
Less than $10,000,000 est. value
Chesapeake, VA

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Woodford Estates Phase 2
New Construction
Conception
Chesapeake, VA 23322

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Subgrade Stabilization
Infrastructure
Results

A Whispering Pines
New Construction
Conception
Chesapeake, VA

Last Updated 08/02/2022 01:31 AM
Project Title

Demolition of 1453 Whittamore Road

Physical Address View project details and contacts
City, State (County) Chesapeake, VA 23322   (Chesapeake City County)
Category(s) Heavy and Highway, Residential, Single Trades
Sub-Category(s) Environmental, Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition: All labor, tools, materials, supplies, supervision, permits, services, equipment, and any incidentals necessary to remove the buildings at the following location

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents