Similar Projects
Soccer Complex to Coolidge Road - City of East Lansing
Infrastructure
Conception
$600,000 est. value
East Lansing, MI

Parking Lot Resurfacing and Entry Drives / East Lansing Soccer Complex
Infrastructure
Conception
$325,000 CJ est. value
East Lansing, MI 48823

Dye Reservoir Vegetation Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Lansing, MI 48933

City View Lansing Apartments
New Construction, Infrastructure - 3,500 SF
Design
$25,000,000 CJ est. value
Lansing, MI 48933

Rehabilitation of Steam Manholes MH905 and MH910
Infrastructure
Bidding
$300,000 CJ est. value
Lansing, MI 48933

2023 Roadway Improvements Crushing and HMA Overlay
Infrastructure
Bidding
$550,000 CJ est. value
Meridian charter Township, MI 48864

GM LDT C1XX GA Pull Ahead: Delta Township Facility
Renovation
Post-Bid
Lansing, MI 48933

Wexford Montessori Site Improvements
Infrastructure
Post-Bid
Lansing, MI 48911

North Elementary Site Improvements
Infrastructure
Results
Lansing, MI 48911

Demolition Removal and Site Restoration
Demolition, Infrastructure
Results
$200,000 est. value
East Lansing, MI 48823

General Motors: Delta Township: Battery Plant
New Construction - 2,500,000 SF
Pending Verification
$10,000,000 CJ est. value
Lansing, MI 48933

Neogen Shiawassee Street Manufacturing Plant
New Construction, Infrastructure - 175,000 SF
Pending Verification
$70,000,000 CJ est. value
Lansing, MI 48912

International Center - Renew/Replace Drain Piping System - Office - Michigan State University
Renovation, Infrastructure
Conception
$650,000 CJ est. value
East Lansing, MI 48824

New Patient Tower - Sparrow Health System / Lansing
New Construction, Infrastructure
Design
$350,000,000 CJ est. value
Lansing, MI 48912

Asphalt, Concrete, and Deck Replacement
Infrastructure
Bidding
$543,000 CJ est. value
Lansing, MI 48933

Last Updated 03/28/2023 10:04 AM
Project Title

Meridian Company Industrial Building

Physical Address View project details and contacts
City, State (County) East Lansing, MI 48823   (Ingham County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: New construction of a building for industrial/office use. As of March 28, 2023, this is in design pending approvals. No building permit applications have been submitted yet. The owner has their own list of contractors, but further information hasn't been disclosed. A construction timeline hasn't been confirmed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, 31,355 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents