Similar Projects
Silverleaf Development Master Plan
New Construction
Conception
Winter Garden, FL 34787

Hernando County Detention Center - Warehouse
New Construction
Conception
$400,000 est. value
Brooksville, FL 34604

Studio Works
New Construction - 22,671 SF
Design
$1,950,000 est. value
Hobe Sound, FL 33455

Public Storage # 20216
New Construction - 66,310 SF
Design
Fort Pierce, FL 34947

Potable Reuse Demonstration Facility
New Construction - 3,000 SF
Bidding
$3,600,000 est. value
Middleburg, FL

Self Storage Facility / Panama City Beach
New Construction - 117,436 SF
Bidding
$23,000,000 est. value
Panama City Beach, FL 324072884

Landings Self Storage Facility
New Construction - 41,199 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Vero Beach, FL 32967

Two-Phase Design Build of Zone 8 Security Forces Mobility Storage, Tyndall AFB, FL (Bay County, FL)
New Construction, Term Contract - 3,000 SF
Post-Bid
Panama City, FL 32403

Flight Line Munitions Storage Area (MSA) Facilities, Tyndall AFB, FL
Results
$25,000,000 to $100,000,000 est. value
Panama City, FL

Maintenance Facility Repairs (Warehouse # 3)
Results
Less than $50,000 est. value
Miami, FL 33155

Treeline 28 Commerce Park
New Construction - 335,000 SF
Construction
Fort Myers, FL 33913

Gardens Self Storage
New Construction, Demolition - 83,613 SF
Construction
$7,791,939 est. value
Palm Beach Gardens, FL 33403

Storage USA
New Construction - 118,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Vero Beach, FL 32967

Tidewater Commercial Center
New Construction - 80,000 SF
Pending Verification
Spring Hill, FL

Hobe Sound Auto Vault
New Construction - 93,184 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Hobe Sound, FL 33455

Last Updated 07/20/2022 06:58 AM
Project Title

Install a Metal Storage Building at the Lake County Water Authority Office

Physical Address View project details and contacts
City, State (County) Tavares, FL 32778   (Lake County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing and installing a metal storage building at the Lake County Water Authority Office, including all necessary sitework, pouring concrete footers and slab, furnishing, and installing a metal storage building and installing electrical service, outlets and lighting. There will also be an add/alternate item to construct an internal office structure inside the metal building with a loft storage area and stairs, a restroom, plumbing and air conditioning unit. The metal building with be 120-feet long and 60-feet wide and between 16- feet and 20-feet tall. The LCWA understands that the metal building may be a pre-engineered structure and will entertain slight variances in the final dimensions. The metal building will have three 12-foot by 14-foot overhead doors, three 10-foot by 10-foot overhead doors and two exterior swing doors. All overhead doors will be chain hoist operated with a locking mechanism. The metal sheeting will be a minimum of 26-gauge steel. All steel surfaces will be painted to protect from corrosion and will be colored to match the LCWA Office as much as practical. The entire structure will be placed on a minimum 6-inch, reinforced concrete slab that will meet building code requirements. Electrical service will be included in the project. A minimum of 20 outlets will be installed throughout the building at an approximate 15-foot interval (see Exhibit B). All outlets will be two-gang, grounded outlets with a metal box. All wires will be protected in metal conduits. Overhead, energy-efficient, LED lighting of the entire metal building will be included in the project. Lighted "Exit" signs and exterior lighting will be installed per building codes. The electrical panel will be located inside the structure near the electrical supply line. If the add/alternate office structure is included, approximately 10 additional outlets and overhead lighting for the office space would be included.The stairs will be a minimum of forty-eight-inches (48") wide. Tread with will be a minimum of ten-inches (10"). There will be a forty-eight-inch by forty- eight-inch landing at the top of the stairs.

Details

Warehouse/Storage, 7,200 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents