Project Title | Install a Metal Storage Building at the Lake County Water Authority Office |
Physical Address | View project details and contacts |
City, State (County) | Tavares, FL 32778 (Lake County) |
Category(s) | Commercial |
Sub-Category(s) | Warehouse/Storage |
Contracting Method | Competitive Bids. |
Project Status | Results, |
Bids Due | View project details and contacts |
Estimated Value | $800,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnishing and installing a metal storage building at the Lake County Water Authority Office, including all necessary sitework, pouring concrete footers and slab, furnishing, and installing a metal storage building and installing electrical service, outlets and lighting. There will also be an add/alternate item to construct an internal office structure inside the metal building with a loft storage area and stairs, a restroom, plumbing and air conditioning unit. The metal building with be 120-feet long and 60-feet wide and between 16- feet and 20-feet tall. The LCWA understands that the metal building may be a pre-engineered structure and will entertain slight variances in the final dimensions. The metal building will have three 12-foot by 14-foot overhead doors, three 10-foot by 10-foot overhead doors and two exterior swing doors. All overhead doors will be chain hoist operated with a locking mechanism. The metal sheeting will be a minimum of 26-gauge steel. All steel surfaces will be painted to protect from corrosion and will be colored to match the LCWA Office as much as practical. The entire structure will be placed on a minimum 6-inch, reinforced concrete slab that will meet building code requirements. Electrical service will be included in the project. A minimum of 20 outlets will be installed throughout the building at an approximate 15-foot interval (see Exhibit B). All outlets will be two-gang, grounded outlets with a metal box. All wires will be protected in metal conduits. Overhead, energy-efficient, LED lighting of the entire metal building will be included in the project. Lighted "Exit" signs and exterior lighting will be installed per building codes. The electrical panel will be located inside the structure near the electrical supply line. If the add/alternate office structure is included, approximately 10 additional outlets and overhead lighting for the office space would be included.The stairs will be a minimum of forty-eight-inches (48") wide. Tread with will be a minimum of ten-inches (10"). There will be a forty-eight-inch by forty- eight-inch landing at the top of the stairs. |
||||||||||||||||||||||||||||||||||
Details | Warehouse/Storage, 7,200 SF New Construction.
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |