Similar Projects
Vancouver Innovation Center Master Plan
New Construction, Renovation, Infrastructure
Conception
Vancouver, WA 98683

SR 14, I-205 to SE 164th Avenue Auxiliary Lanes
Infrastructure
Bidding
$20,000,000 est. value
WA

Systemic Safety Improvements
Infrastructure
Bidding
$180,000 to $210,000 est. value
Poulsbo, WA

Hatch Road Bridge Deck Replacement
Infrastructure
Post-Bid
$1,800,000 to $2,200,000 est. value
Spokane, WA

Transit Facility Improvements Work Order
Infrastructure
Post-Bid
WA

I-5, SR 506 to Toledo Vader Road Vicinity NB Paving
Infrastructure
Results
Toledo, WA 98591

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Results
WA

J Street SouthWest, Alder Street SouthWest and Birch Street SouthWest Roadway Resurfacing Project
Infrastructure
Bidding
$400,000 est. value
Quincy, WA 98848

N 6th St/ N 8th St Concrete Pavement Repair Project
Infrastructure
Post-Bid
Washougal, WA 98671

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

2022 Annual Roads Program
Infrastructure
Bidding
$575,000 to $650,000 est. value
Bainbridge Island, WA

Asphalt Crushing Services
Infrastructure
Post-Bid
Longview, WA

Sequim-Dungeness Way and Woodcock Road
Infrastructure
Results
$900,000 to $1,000,000 est. value
Sequim, WA 98382

2022 Overlay Project
Infrastructure
Bidding
$170,000 est. value
Lyman, WA

Metzger Road Project CRP
Infrastructure
Post-Bid
Carson, WA 98610

Last Updated 04/26/2022 12:11 AM
Project Title

West Front Street Reconstuction

Physical Address View project details and contacts
City, State (County) Lynden, WA   (Whatcom County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for the reconstruction of approximately 1,800 feet of roadway along Front Street, from Tromp Road, then easterly to Duffner Drive. Other work included is the construction of approximately 1,800 feet of water main, 1,800 feet of stormwater improvements, and 1,400 feet sanitary sewer main. All work shall be in accordance with the contract plans, special provisions, the WSDOT Standard Specifications, and Standard Plans. All materials, equipment, labor, and other miscellaneous items required to complete the work shall be furnished by the contractor unless otherwise noted on the contract plans.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents