Similar Projects
Lamar Academy HVAC Improvements
Alteration
Bidding
$2,000,000 est. value
McAllen, TX 78501

Cooling Tower Maintenance
Alteration
Bidding
Edinburg, TX 78541

HVAC Refrigerants for Central Supply Warehouse
Post-Bid
Pharr, TX

School District HVAC Air Purification Systems
Post-Bid
Edinburg, Pharr, TX

Air Handling Unit Replacements
Results
$2,304,220 est. value
McAllen, TX 78503

HVAC Unit Replacement
Results
Weslaco, TX 78599

JFK and Tabasco Elementary Schools HVAC Upgrades
Alteration
Bidding
Corpus Christi, La Joya, TX 78416

HVAC and Mechanical Products
Term Contract
Post-Bid

Weslaco East High School-Gymnasium HVAC Retrofits
Results
$625,000 to $675,000 est. value
Weslaco, TX 78596

Memorial Middle School Heating and Air Condition (HVAC) Improvements
Alteration
Bidding
Edinburg, TX 78542

Air Conditioning Units
Post-Bid
Edinburg, TX

Chiller Maintenance Services in Edinburgh Texas
Results
Edinburg, TX

Freddy Gonzalez Elementary School Heating and Air Condition (HVAC) Improvements
Alteration
Bidding
Edinburg, TX 78539

Air Conditioner Duct Installation for Crawford, Flores/Zapata, Gorena and Ramirez Elementary Schools
Post-Bid
Edinburg, TX 78541

Replacement of Administration Offices Building Chiller
Results
Mission, TX 78572

Last Updated 03/17/2022 09:17 AM
Project Title

Fire Substation No. 3 Air Conditioning Modifications

Physical Address View project details and contacts
City, State (County) McAllen, TX 78501   (Hidalgo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $35,600
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of installation of sheet rock (gyp) area as specified in plans. To include return air ductwork and return air grilles for the existing two HVAC systems. In addition, remove existing ceiling return air grilles not connected to return air ductwork, provide ceiling tiles as required. Replace and remove damaged ceiling batt insulation. Moreover, provide 12-turbine type roof mounted motor-less gravity ventilators. Uncover all existing roof vents along the perimeter soffit vents. Rebalance Air Handling Units to 2,000 CFM each for a complete working system. Located at 329 S. Peking St. McAllen, TX 78501.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents