Similar Projects
Rhinelander - Eagle River Const / Pavement Replacement
Infrastructure
Conception
$3,000,000 CJ est. value
Rhinelander, WI 54501

Minocqua - Manitowish
Infrastructure
Conception
$2,000,000 CJ est. value
Rhinelander, WI 54501

Airfield Pavement and Electrical Rehabilitation
Infrastructure
Bidding
$4,150,000 CJ est. value
Rhinelander, WI 54501

Town of Newbold - Town Hall
New Construction, Infrastructure - 5,200 SF
Post-Bid
$800,000 CJ est. value
Rhinelander, WI 54501

Public Safety Complex Addition and Remodel Nicolet College Rhinelander Campus
Addition, Demolition, Infrastructure - 2,248 SF
Post-Bid
$750,000 CJ est. value
Rhinelander, WI 54501

Lakes ATV Trail
Infrastructure
Results
Woodboro, WI

Monico - Eagle River, STH 32 to Vilas County Line
Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Refurbishing an Aeration System at Horsehead Lake
Infrastructure
Post-Bid
$260,000 CJ est. value
Lake Tomahawk, WI 54539

2022 Street Improvements
Infrastructure
Results
Rhinelander, WI

RFP D/B - Snowmobile Trail Bridge - Clintsman CTY K and153
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Tripoli, WI 54564

Torpy Park Sanitary Improvements
Infrastructure
Results
$200,000 est. value
Minocqua, WI

Paving
Infrastructure
Post-Bid
$500,000 CJ est. value
Cassian, WI 54529

2023 Oneida Avenue Area Utility and Street Improvements
Infrastructure
Results
$5,803,643 CJ est. value
Rhinelander, WI 54501

Last Updated 05/09/2023 01:10 PM
Project Title

Cobblestone Hotel & Suites / Rhinelander

Physical Address View project details and contacts
City, State (County) Rhinelander, WI 54501   (Oneida County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Sidewalks/Parking Lot, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

1) the Subcontractor is Responsible for the Compliance With All Local and State Municipality Codes (Materials, Labor, Individual Subcontractor Plans, Finished Product, Etc.). Codes and Local Ordinances Take Precedence Over the Plans. It is the Subcontractors Responsibility That the Scope of Work Within Their Contract Complies With Any and All Codes or Ordinances as Required. 2) the Subcontractor is Responsible for the Compliance With All Osha Regulations. 3) All Consumables Are Supplied by the Subcontractor for Their Individual Scope or Work. 4) Subcontractors May Have Access to a Skytrack Lift That Will Be Provided Onsite for Unloading/receiving Purposes. Any Additional Cranes, Lifts, Scaffolding, Etc. Is to Be Provided by the Subcontractor to Complete Their Scope of Work. Subcontractor When Work With Lifts and/or Scaffolding is to Follow Osha Regulations For Proper Use and Safety. 5) Subcontractor is Responsible for All Required Firestopping (Fire Caulking, Fire Collars, Putty Packs, Etc.), Blocking, Draftstopping/air Infiltration, Etc. Per Code as Related to This Scope. 6) Subcontractor is Responsible for Contacting Local Utilities Protection Center (Upc) 72 Hours Prior to Any Work Being Performed to Locate and Mark Any Existing Utilities as Required for Any Digging/trenching/excavating Work. 7) Subcontractor is to Supply to the General Contractor a Close-out Book Including All Warranty Information (Including Contact Information for Future Warranty Work), Specification Submittals, Msds Sheets, and Attic Stock. 8) No Deviations From the Plans Shall Be Made Without Prior Approval From the General Contractor. 9) No Smoking of Any Kind is Allowed in the Building at Any Time, Including No E-cigarettes & Vapes. 10) Subcontractor is Responsible for Keeping the Jobsite Clean and Free of Debris. All proposals must account for the scope of work as described on the Divisions and Scopes pages. It is the awarded bidders responsibility to produce all necessary permits, designs, and shop drawings. It is the responsibility of the awarded bidder to perform all work to all relevant building codes, specifications, and manufactures recommendations. Subcontractor MUST clean up any and all materials, waste, debris, etc. related to their work prior to leaving the jobsite upon completion. This Request for Proposals, however, does not commit BriMark Builders to award a contract, to pay any costs incurred in the preparation of a proposal or to contract for the goods and/or services offered. Tentative Ground Breaking Start Date: Summer 2023 Tentative Construction Completion Date: Spring 2024

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents