Similar Projects
2022 Tar and Chip Project
Infrastructure
Design
$30,000 CJ est. value
Parryville, PA 18244

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Bid Package 3, Exterior Renovations and Upgrades at Exterior Renovations and Upgrades at BES ,DES,NEES ,VFES ,TEMS ,VFMS ,CHS
Infrastructure, Renovation
Sub-Bidding
$3,000,000 CJ est. value
Wayne, PA 19087

Precast T-Walls Stone Storage Contract
Alteration
Post-Bid
Montoursville, PA

Inlet Precast Concrete Galvanized
Alteration
Post-Bid
Everett, PA 15537

Tyrone Area High School Loading Dock Renovations Project - General Construction
Results
Less than $184,000 est. value
Tyrone, PA 16686

Concrete New and Replacement
Results
Downingtown, PA

Boyd Recreational Area Passive Park Development and Related Improvements - Phase 2
Infrastructure
Bidding
$515,000 CJ est. value
Harrisburg, PA 17102

Construction of a Sludge Transfer Bed
Alteration
Post-Bid
Brookville, PA

District Wide Masonry and Concrete Repairs
Alteration
Results
$70,000 est. value
Chester, PA

Johnson Park Improvements Project
Infrastructure
Bidding
$171,050 CJ est. value
Nesquehoning, PA 18240

Precast Concrete Inlets and Risers
Alteration
Post-Bid
Carnegie, PA

Main Street Streetscape - Electrical/Concrete
Alteration
Results
$450,000 est. value
PA

Paxon Hollow County Club Improvements - General, Electrical, Mechanical, and Plumbing Contracts
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Media, PA 19063

Last Updated 03/02/2023 11:04 AM
Project Title

Construction of Green Stormwater Infrastructure in East Clapier St at Wakefield St, West sheldon St from Elwood St to Stenton Ave, Bringhurst park at Wakefield St

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19102   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $922,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 2, 2023, project is pending award. A timeline for award has not been confirmed. Construction of Green Stormwater Infrastructure in East Clapier St at Wakefield St, West Sheldon St From Elwood St to Stenton Ave (Est. $500,000 to $1,000,000) PWD WORK NO. S-50202-G No quotes will be accepted unless a Questionnaire and Financial Statement for Qualified Sellers with all questions fully answered is filed with portal on or before Tuesday, May 17, 2022 In Lieu of prebid meeting, any questions should be emailed to Jessica.Musti@phila.gov by Friday, May 20, 2022. These Bids require Compliance with Office of Economic Opportunity. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE- 17% - 20% and WBE- 10% - 13% This work includes all work necessary to install complete and fully usable green stormwater infrastructure surface and sub-surface features in the project areas as shown and described in the Contract Documents. In general, the work includes sawcutting and removal of existing sidewalk and paving; excavation of trenches and disposal of material; excavation and grading of rain gardens, stormwater bumpouts and swales; installation of check dams and spillways; installation of clean washed stone and geotextile; installation of thermoplastic, ductile iron and RCP drainage pipe and fittings, cleanouts and riser structures; installation of energy dissipaters; installation of observation wells; installation of trench drains and concrete aprons; installation of new stormwater inlets, control structures and laterals; installation and modification of existing inlets, restoration of sidewalks, curbs and streets; planting of trees and landscaping, and placement and grading of specified stormwater and planting soils. Completion- (150) CALENDAR days

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents