Similar Projects
Last Updated | 03/02/2023 11:04 AM |
Project Title | Construction of Green Stormwater Infrastructure in East Clapier St at Wakefield St, West sheldon St from Elwood St to Stenton Ave, Bringhurst park at Wakefield St |
Physical Address | View project details and contacts |
City, State (County) | Philadelphia, PA 19102 (Philadelphia County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $922,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 2, 2023, project is pending award. A timeline for award has not been confirmed. Construction of Green Stormwater Infrastructure in East Clapier St at Wakefield St, West Sheldon St From Elwood St to Stenton Ave (Est. $500,000 to $1,000,000) PWD WORK NO. S-50202-G No quotes will be accepted unless a Questionnaire and Financial Statement for Qualified Sellers with all questions fully answered is filed with portal on or before Tuesday, May 17, 2022 In Lieu of prebid meeting, any questions should be emailed to Jessica.Musti@phila.gov by Friday, May 20, 2022. These Bids require Compliance with Office of Economic Opportunity. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE- 17% - 20% and WBE- 10% - 13% This work includes all work necessary to install complete and fully usable green stormwater infrastructure surface and sub-surface features in the project areas as shown and described in the Contract Documents. In general, the work includes sawcutting and removal of existing sidewalk and paving; excavation of trenches and disposal of material; excavation and grading of rain gardens, stormwater bumpouts and swales; installation of check dams and spillways; installation of clean washed stone and geotextile; installation of thermoplastic, ductile iron and RCP drainage pipe and fittings, cleanouts and riser structures; installation of energy dissipaters; installation of observation wells; installation of trench drains and concrete aprons; installation of new stormwater inlets, control structures and laterals; installation and modification of existing inlets, restoration of sidewalks, curbs and streets; planting of trees and landscaping, and placement and grading of specified stormwater and planting soils. Completion- (150) CALENDAR days |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |