Similar Projects
Roadway and Bridge Reconstruction
Renovation, Infrastructure
Bidding
$100,000,000 est. value
Downers Grove, IL

Asphalt Repair Project District Wide
Infrastructure
Bidding
$200,000 est. value
Wheaton, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

Pavement Resurfacing
Post-Bid
Burr Ridge, IL

Crack and Joint Sealing of PCC Pavement
Results
Naperville, Plainfield, IL 60544

2020 Rebuild Illinois Bonds Program
Results
Less than $1,450,000 est. value
Darien, IL

Width Resurfacing W/HMA Surf
Infrastructure
Bidding
$500,000 est. value
Lombard, IL

Repair Roads and Concrete
Post-Bid
$500,000 est. value
Glen Ellyn, IL

Resurfacing Abbeywood Drive and Green Trails Drive from Naper Boulevard to College Road in the Village of Lisle
Results
Lisle, IL 60532

2022 Concrete Patching Program
Infrastructure, Alteration
Bidding
$400,000 est. value
Elmhurst, IL 60126

2021 Crack Sealing Bituminous Pavement
Post-Bid
Bloomingdale, IL

(2.80-Mile) Improvement on 1-290 from Grand Ave to Cook County Line Rd Consists of Cleaning and Sealing Cracks and Joints in the Existing Concrete Pavement
Results
Elmhurst, IL 60126

Morton Road Reconstruction
Infrastructure
Bidding
$1,600,000 est. value
Carol Stream, IL 60197

MFT Resurfacing
Post-Bid
Woodridge, IL

Resurfacing, Curb and Gutter Replacement, Sidewalk Replacement, and Pavement Markings on Prince Crossing Road from Geneva Road to IL 164 in West Chicago
Results
West Chicago, IL 60185

Last Updated 05/23/2022 12:21 AM
Project Title

Stockberry Lane and Grove Avenue Resurfacing

Physical Address View project details and contacts
City, State (County) West Chicago, IL   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $580,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work as shown on the plans and as specified herein consists mainly of roadway resurfacing and concrete flat work. The work is to be performed on and along Stockberry Lane in the Cornerstone Lakes Subdivision and Grove Avenue, east of Neltnor Boulevard (IL Route 59). The net length of roadway improvements is approximately 2,630 feet (0.5 miles) within the City of West Chicago in DuPage County. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, parkway/ditch restoration, manhole structure repair and adjustments, thermoplastic pavement markings and all incidental and collateral work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents