Similar Projects
Last Updated | 05/23/2022 12:21 AM |
Project Title | Stockberry Lane and Grove Avenue Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | West Chicago, IL (DuPage County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $580,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work as shown on the plans and as specified herein consists mainly of roadway resurfacing and concrete flat work. The work is to be performed on and along Stockberry Lane in the Cornerstone Lakes Subdivision and Grove Avenue, east of Neltnor Boulevard (IL Route 59). The net length of roadway improvements is approximately 2,630 feet (0.5 miles) within the City of West Chicago in DuPage County. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, parkway/ditch restoration, manhole structure repair and adjustments, thermoplastic pavement markings and all incidental and collateral work |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |