Similar Projects
Morrison Ridge Shopping Center
New Construction, Infrastructure - 765,000 SF
Conception
$76,500,000 est. value
Concord, NC 28027

Academy Recreation Center/Gibson Village Complex Development - Phase IV Gibson Field - Connectivity - City of Concord
Renovation, Infrastructure
Conception
$700,000 est. value
Concord, NC 28025

Mount Pleasant Park Construction
New Construction
Design
Mount Pleasant, NC

Davidson Highway Apartments
New Construction, Infrastructure
Design
$29,400,000 est. value
Concord, NC 28027

2022 Kannapolis Resurfacing
Infrastructure
Bidding
$300,000 est. value
Kannapolis, NC

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Cats Mow Special Track Contractor
Renovation
Post-Bid
Charlotte, NC

Intersection Improvements on Bruton Smith Boulevard at Weddington Road
Results
$242,200 est. value
Concord, NC 28026

Bethel School Road Sidewalk Improvements
Results
$100,000 to $200,000 est. value
Midland, NC

Academy Recreation Center/Gibson Village Complex Development - Phase II and Phase III - City of Concord
Renovation, Alteration
Conception
$7,404,000 est. value
Concord, NC 28025

Furnishing of Necessary Materials and Construction of 2021 Paving Program
Infrastructure
Post-Bid
Davidson, NC

Miscellaneous Asphalt Resurfacing, Milling, Widening, Shoulder Construction, Shoulder Reconstruction and Thermoplastic Pavement Markings
Results

Concord Farms Realignment - City of Concord
Alteration
Conception
$4,000,000 est. value
Concord, NC 28027

On-Street Parking and Curb Lane Management
Infrastructure
Post-Bid
Charlotte, NC

Streets Preservation Contract No Str21
Results
Concord, NC

Reported 07/18/2022 02:25 PM
Project Title

Coddle Creek Greenway Development - City Of Concord

Physical Address View project details and contacts
City, State (County) Concord, NC 28025   (Cabarrus County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $13,525,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The design for the Coddle Creek Greenway will be completed by Engineering, and then the development will be done in three phases. Phase I: Includes greenway within Dorton Park along Coddle Creek, connectivity downstream to Poplar Crossing, and a bridge connection to multi-use path along the south side of Poplar Tent Road (Poplar Tent Road widening), approximately .75 miles at $1.5 million per mile plus bridge costs. Then extends the trail to Weddington Road and provides a multi-use path along Weddington Road to George Liles Pkwy, work is approximately 1.65 miles at $3.1 million per mile as identified in the Open Space Connectivity Analysis (OSCA). Phase II: Extends the trail from Weddington Road to Concord Parkway/Concord Farms Road along Coddle Creek. Total of 1.75 miles at $3.1 million per mile. Phase III: Extends the trail from Dorton Park to Kannapolis (Afton Ridge) along Coddle Creek. Total of .60 miles at $3.1 million per mile. As of July 16, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Park/Playground, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents