Similar Projects
Last Updated | 02/16/2024 06:31 PM |
Project Title | SR 590 Over Jones Creek |
Physical Address | View project details and contacts |
City, State (County) | Hawley, PA 18428 (Pike County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected April 2024 |
Bids Due | View project details and contacts |
Estimated Value | $2,039,521 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Project is for the Replacement of a Bridge on State Route 590, Section 654, in Wayne County, Salem Township, in the Commonwealth of Pennsylvania. The Project Being Situated as Follows: Sr 590 From Segment 0020 Offset 1256 to Segment 0030 Offset 0322, Salem Township, Wayne County, With a Total Work Area Length of 450.00 Feet (0.085 Miles). The Sr 590 Sec 654 Bridge Replacement Project Includes the Replacement of the Existing Single Span C.i.p. Concrete T-beam Bridge With a Single Span P/s Concrete Spread Box Beam Bridge on Integral Abutments. The Proposed Structure Will Have a Normal Clear Span of 74-8 5/8 and Accommodate (2) 12 Foot Lanes With (2) 7-3 3/8 Foot Shoulders. Other Work Includes Excavation, Full Depth Bituminous Paving Bridge Approach, New Guide Rail, Drainage, E&s Control Measures, Detour Signing, Temporary Fencing, Driveway Adjustment, Permanent Signing, Pavement Markings, Landscaping, and Other Miscellaneous Construction Work. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 59.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - SR 590 Over Jones Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |