Last Updated | 07/22/2022 11:03 AM |
Project Title | Gas Main Relocation State Route 48 |
Physical Address | View project details and contacts |
City, State (County) | Summerville, GA 30747 (Chattooga County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $199,890 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Under this project, the Contractor shall furnish all labor, equipment and materials necessary to relocate a gas main in conflict with GDOT improvements as shown in the construction drawings. More specifically, the work shall consist of +-992 LF of 4" steel gas main installation, including a +-600 LF bore under Raccoon Creek and two road bores, 2 service relocations, +-32 SF pavement replacement, erosion & sediment control, grassing and all other appurtenances necessary for a complete installation. Time allotted for completion of work is 105 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. The Scope of Work as described herein is defined as "utility contracting" in accordance with O.C.G.A. 43-14-2(17) so the Contractor preforming the work must provide proof of a valid license by the State of Georgia as a "Utility Contractor" and must employ a "Utility Manager" certification holder who will have oversight on all the work. Therefore, the Contractor submitting a bid must list the license number of the Contractor performing the utility contracting on the face of the bid envelope and on the bid form and provide proof of a valid license with the bid. No bid will be opened unless it contains the Contractor's Utility License Number on the envelope. See Instruction to Bidders for additional bidding requirements. Prequalification may be required of Bidders prior to the award of contract. At the Owner's request, detailed written evidence such as financial data, bonding capacity, previous experience, present commitments, and other such data as may be necessary to assist Owner in determining Contractor's qualifications shall be provided per the Instructions to Bidders contained in the contract documents. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. All anticipated federal, state, or local permits required for the project will be obtained prior to signing of the construction contract. All anticipated rights of way and easements required for the project will be obtained prior to signing of the construction contract. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Owner reserves the right to waive informalities, and to readvertise |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |