Similar Projects
SR 20/Tributary to Thornton Creek - Culvert Replacement
Infrastructure
Conception
$871,000 CJ est. value
Twisp, WA 98856

SR 20/Tributary to Thornton Creek - Culvert Replacement
Infrastructure
Conception
$871,000 CJ est. value
Twisp, WA 98856

6th Street Improvements Project
Infrastructure
Bidding
$635,000 CJ est. value
Coulee Dam, WA 99116

Central Landfill Phase 4 Development
Infrastructure
Bidding
$800,000 CJ est. value
Okanogan, WA 98840

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Thorndyke Road MP 4.71 Culvert Replacement
Infrastructure
Results
$1,656,400 est. value

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Results
$228,286,585 CJ est. value
Kirkland, WA 98033

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

Okanogan County Transit Authority Shelter Placement Project
Infrastructure
Bidding
$125,000 CJ est. value
Okanogan, WA 98840

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

In-Stream Fish Weir Design at Salmon Creek Road and Salmon Creek
Infrastructure
Post-Bid
Okanogan, WA

Sitework - Portable Foundation (Structural Drawings)
Infrastructure
Post-Bid
$200,000 est. value
Okanogan, WA

Salmon Creek Drainage
Infrastructure
Post-Bid
$350,000 est. value
Okanogan, WA

Last Updated 12/01/2022 07:01 PM
Project Title

RFP Engineering - Channel Restoration and Bank Protection in Salmon Creek and Culvert Replacement in Loup Loup Creek

Physical Address View project details and contacts
City, State (County) Nespelem, WA 99155   (Okanogan County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected July 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Per the owner, as of December 1, 2022, they did not award the construction contract for either project. The owner states that the The work window for these projects will be posted July 1, 2023. Closed solicitation has been included below for reference. .................. The Colville Confederated Tribes Anadromous Fisheries Division in a continued effort to rehabilitate habitat to benefit native salmonids has conducted topographic site surveys within reaches of two tributaries of the Okanogan River, Salmon and Loup Loup creeks. The surveys for these sites are included in this announcement; .pdf and .dwg files can be provided upon request. The objective of these surveys was to improve habitat for anadromous salmonids, specifically summer steelhead and spring Chinook salmon and reduce risk of negative impacts to adjacent properties and habitat downstream. The Confederated Tribes of the Colville Reservation (CTCR) Anadromous Fisheries Division is seeking proposals from qualified engineering firms to award engineering and design services contract to support salmon and steelhead habitat improvement projects on Salmon and Loup Loup creeks, tributaries to the Okanogan River in Okanogan County, Washington. The contract resulting from this request will cover the development of two or more conceptual design options for a stream reach which will optimize rearing habitat at base flow and reduce bank and surface erosion along the left bank within a reach in Salmon Creek. In addition the contract will identify an alternative drainage structure and design the proper installation on Loup Loup Creek to adequately pass peak flow, replacing an undersized culvert. The Colville Confederated Tribes intends to award the design contract to the highest quality bidder for the scope of work described in this RFP. The performance period for the awarded contract will be between the contract start date and June 1, 2021. (Extended to September 1, 2021, if providing oversight for project implementation on Salmon Creek) A site visit is not required. By submitting his/her proposal, the Contractor acknowledges that he/she has satisfied him/herself as to the nature of the work requested. Requests for interpretation/clarification of this RFP must be emailed to: Chris.Fisher@colvilletribes.com Unauthorized contact with other tribal employees regarding this RFP may result in disqualification. All oral communications will be considered unofficial and non-binding on the Tribes. All questions must be submitted no later than 5:00 p.m., PST, February 9, 2021. Any contract negotiated in response to this RFP will require either a 25% retainage or a performance bond. Any contract awarded with a value greater than $100,000 will require a performance bond. The Tribes reserves the right to reject any or all proposals, to waive any minor informalities or irregularities contained in any proposal, and to accept any proposal deemed to be in the best interest of the Tribes. The costs are undetermined at this time since the design has not been developed. As of January 25, 2021 this project is seeking proposals. The earliest an advertisement for an RFP for contractors would be summer of 2021. Depending upon the design, the project would be completed within 3 weeks.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents