Similar Projects
Orchard Road - High Line Canal Trail Crossing Improvements
Alteration
Bidding
Greenwood Village, CO

2022 Concrete Replacement Program
Infrastructure
Bidding
CO

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Post-Bid
Centennial, CO

Cheyenne Arapaho Park Construction
New Construction
Post-Bid
Englewood, CO 80113

Lone Creek Regional Trail Phase 1A
Results
Less than $1,004,305 est. value
Centennial, CO 80112

Greenwood Gulch Undercrossing Improvements
Results
Greenwood Village, CO

C20-050 Federal Boulevard Sidewalk Improvements
Infrastructure
Post-Bid
CO

Greenwood Gulch Undercrossing
Results
$250,000 to $350,000 est. value
Centennial, CO 80111

Englewood Service Center Drainage and Parking Lot Improvements
Results
Less than $500,000 est. value
Englewood, CO

Replace Curb Ramps in Region 1
Results
$1,000,000 to $5,000,000 est. value

2021 Concrete Removal and Replacement
Results
$75,000 to $85,000 est. value
Cherry Hills Village, CO

2021 Infill Sidewalk Program
Results
Less than $420,825 est. value
Centennial, CO

Cenntennial Link Trail
Results
Centennial, CO

Chenango Park Trail Reconstruction
Infrastructure
Results
Greenwood Village, CO

S. Parker Road Sidewalk Improvements
Infrastructure
Results
$540,000 to $600,000 est. value
Aurora, CO 80040

Last Updated 03/08/2022 10:37 AM
Project Title

Sheridan Safe Stops State Highway No. 88 and City Streets Project

Physical Address View project details and contacts
City, State (County) Sheridan, CO   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 to $415,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes upgrading a total of 14 bus stops, 6 of which are located on Federal Blvd., a CDOT ROW, requiring CDOT permitting. The project is a local agency federal aid project requiring Davis-Bacon wages and DBE goals. The project includes: sidewalk and miscellaneous removals; erosion control; minor landscape restoration; concrete and asphalt pavements; benches and trash receptacles; construction traffic control and other miscellaneous work.

Details

Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Accessories, Landscape Edging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents