Similar Projects
Chapaton Basin and 9 Mile Emergency Bypass Sewer Structural Repairs
Post-Bid
Clinton Township, MI

2020 Sewer Investigation
Results
MI

West Trunk Sanitary Sewer Pipeline and Manhole Inspection
Results
Warren, MI 48093

2020 Sewer Point Repairs
Results
Clinton Township, MI

2019 Sanitary Sewer Repairs
Results
Warren, MI

2020 Sanitary Sewer Cleaning and CCTV Investigation
Results
Clinton Township, MI

2020 Sanitary Sewer Cleaning and CCTV Investigation - Contract 2
Results
Clinton Township, MI

Romeo Arm Interceptor Segment 5 Lining
Results
Fraser, Sterling Heights, MI

Water and Sewer Supply Parts
Term Contract
Results
Warren, MI

Stilwell Manor Improvements-Phase 2
Results
Warren, MI

2020-2021 Sewer and Water Repair Supplies and Water Meters Contract
Term Contract
Results
Saint Clair Shores, MI 48081

Sanitary Collection System Flow Meters Project
Results
Less than $344,680 est. value
Warren, MI 48093

Sewer Rehabilitation C.I.P.P. Lining
Results
Less than $191,000 est. value
Chesterfield, MI 48047

2020 Sanitary Sewer Rehabilitation by Open Cut Repairs
Results
Less than $155,200 est. value
Chesterfield, MI 48047

WWTP Sanitary Sewer Retention Basin Cleaning
Results
Warren, MI 48093

Last Updated 07/06/2021 11:33 PM
Project Title

2021 Manhole Rehabilitation Program

Physical Address View project details and contacts
City, State (County) Macomb, MI   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract consists of locating, exposing, and repairing the interior and chimney exterior of various sanitary manholes within the project limits noted on the plans. This work shall include, but is not limited to; excavating and removing existing concrete, asphalt or gravel and/or lawn areas, reconstructing the chimney, preparation of the surface, both interior and exterior, reconstructing the bench and channel, tuck pointing interior pipes, applying an external seal, replacing and raising the frame and cover, and any required restoration. The extent of repairs may not be known or verified until the contractor exposes the structure for the proposed work items.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents