Similar Projects
Reiman Road over Cedar Creek - Replacement - Ottawa County
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Millbury, OH 43447

O'Reilly Auto Parts (RFD) / Rossford
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Rossford, OH 43460

Roche De Boeuf Interurban - Bridge Inspection
Infrastructure, Renovation
Design
$2,450,000 CJ est. value
Bowling Green, OH 43402

Major Reconstruction - IR 280
Infrastructure
Bidding
$11,287,200 CJ est. value
Millbury, OH 43447

PY2022 Village of Bloomdale Storm Sewer Project
Infrastructure
Bidding
$658,498 CJ est. value
Bowling Green, OH 43402

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

New Municipal Building - City of Perrysburg
Demolition, New Construction, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Perrysburg, OH 43551

Northwestern Water and Sewer District Oregon Road Altitude Valve Improvements
Infrastructure
Results
Bowling Green, OH

Walbridge Main Street Waterline Improvements
Infrastructure
Results
$604,000 est. value
Walbridge, OH 43465

JC Reuthinger Memorial Preserve Expansion and Addition - Wood County
Addition, Infrastructure
Pending Verification
$130,000 CJ est. value
Perrysburg, OH 43551

Perrysburg Township Administration Building
New Construction, Renovation, Infrastructure - 8,031 SF
Pending Verification
$2,000,000 CJ est. value
Perrysburg, OH 43551

Noise Wall
Infrastructure
Conception
$700,000 CJ est. value
Bowling Green, OH 43402

Wood County Jail Expansion and Renovation - RFQ for Detention Equipment & Secured Electronics
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$19,806,750 CJ est. value
Bowling Green, OH 43402

WOO Napoleon Road Roundabout
Infrastructure
Results
$1,162,811 CJ est. value
Bowling Green, OH 43402

Abbot Laboratories Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$536,000,000 CJ est. value
Bowling Green, OH 43402

Last Updated 09/28/2023 11:33 AM
Project Title

E. Front St. Storm Sewer Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Pemberville, OH 43450   (Wood County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $138,300 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Planholders are required to pay shipping, handling and tax when applicable. Prices on the planroom do not represent these charges. The estimated project cost is $154,750 The Village of Pemberville reserves the right to reject any or all bids, to waive any informalities or irregularities in the bids received and to accept any bid that it deems most favorable. Bids will be received on a unit price basis as outlined in the bid documents. The scope of work consists of the installation of approximately 387' of 21" storm sewer, 53' of 18" storm sewer, 279' of 15" storm sewer, 90' of 12" storm sewer, 65' of 6" storm sewer taps, 4 catch basins, 3 manholes, and related restoration and erosion control items Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Engineer contact information: Steven Darmofal, P.E., 419-265-2400, email address: Steve.Darmofal@TDEngineeringLLC.com

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents