Similar Projects
Cypress Cove Elementary School Additions
Bidding
Slidell, LA 70461

Phase I Restoration of Hurricane Damage at Cecil Picard Elementary School Modular and Metal
Renovation
Bidding
Maurice, LA 70555

St. Bernard Christian Academy
New Construction - 40,239 SF
Post-Bid
Meraux, LA 70075

Hurricane Laura Damages Restoration to CPSB Administration Building
Renovation
Post-Bid
Lake Charles, LA 70615

Ralph Wilson, Combre and Molo Hurricane Restoration
Renovation
Results
Calcasieu, LA

CPSB Vincent Settlement School – Hurricane Repairs
Renovation
Results
Sulphur, LA 70665

South Live Oak Elementary Additions
Addition
Bidding
Denham Springs, LA 70706

Hurricane Repairs for Calcasieu Parish School Board
Renovation
Post-Bid
Lake Charles, LA

Dequincy Area Schools Hurricane Restoration
Renovation
Results
DeQuincy, LA 70633

Covington Elementary School, Walkway and Conduit Renovations
Renovation
Bidding
Covington, LA 70433

Project Management/Owners Representation Services
New Construction
Post-Bid
Jennings, LA

Cafeteria Renovation and Classroom Addition Woodvale Elementary School
Renovation, Addition
Bidding
Lafayette, LA 70503

Purchase of New Modular Classroom Buildings
New Construction
Post-Bid
Franklinton, LA

Vermilion Parish School Board Renovations
Renovation
Post-Bid
Abbeville, LA

Natchitoches Magnet Elementary and L P Vaughn Elementary Renovation
Renovation
Post-Bid
Natchitoches, LA 71457

Reported 10/21/2021 12:00 AM
Project Title

New Kitchen Hood At Jesse Owens Elementary School

Physical Address View project details and contacts
City, State (County) State-Wide: LA
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of the furnishing and installation of a New Kitchen Hood System including required Fire Suppression System and associated mechanical and electrical components and connections. The project also includes ancillary work to facilitate installation of the Hood System including rooftop curbs, fans and accessories as well as electrical service to connect owner provided Steam Kettle or similar cooking equipment at the new hood location.

Details

Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents