Similar Projects
Polk County Election Office Fire Suppression, Plumbing, Mechanical and Electrical Repairs
Alteration
Results
Des Moines, IA 50309

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

Grimes Office Building Lighting Replacement
Alteration
Post-Bid
Des Moines, IA 50319

Surgical Lights and Video Integration System
Term Contract
Results
Less than $8,000,000 est. value
Des Moines, Iowa City, IA - Saint Cloud, MN - Fargo, ND - Fort Meade, SD

Emergency Generator Systems Inspection and Maintenance
Alteration
Post-Bid
Des Moines, IA

2021 HS Auditorium Audio Visual Improvements - Electrical
Alteration
Results
Des Moines, IA

Animal Control Facility Bid Package No. 15 - Electrical
Renovation, Alteration - 21,900 SF
Results
$1,000,000 est. value
Des Moines, IA 50317

UPS Biomed Server Room Maintenance
Term Contract
Results
Des Moines, IA

HP Aruba Datacenter Switch Refresh
Alteration
Post-Bid
West Des Moines, IA

Des Moines Area Community College Campus Switchgear
Alteration
Results
$1,545,000 est. value
Ankeny, IA 50023

Building Switch Refresh
Alteration
Post-Bid
West Des Moines, IA

Camp Dodge Electrical System Upgrades - Phase 1B1
Renovation
Post-Bid
$818,605 CJ est. value
Johnston, IA 50131

Automotive Specialty Wiring and Accessories
Term Contract
Post-Bid
Des Moines, IA 50309

ITS Infrastructure
Infrastructure
Results
$1,959,104 CJ est. value
Des Moines, IA 50309

Fiber Optic Splicing I-35 Polk/Story County
Term Contract
Post-Bid
Des Moines, IA 50310

Last Updated 01/06/2023 06:03 AM
Project Title

South Ron Positions Early Bid Package Electrical

Physical Address View project details and contacts
City, State (County) Des Moines, IA 50321   (Polk County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $332,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Des Moines Airport Authority is pleased to provide accommodations to individuals with disabilities or groups and encourages participation. To better serve you, please notify us at least three business days in advance when possible, at 515- 256-5100, should special accommodations be required. Work on the improvements shall be commenced any time after a written Notice to Proceed is issued and shall be completed as stated below. The Notice to Proceed will be issued after the preconstruction conference, which is expected to occur in January, 2023. Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract corporate Surety Performance and Payment Bond(s), in a form acceptable to the Board, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount of ten (10%) percent of the Bid and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the Board. The bid shall contain no condition except as provided in the specifications. Supply electrical equipment to be installed under the East Cargo development project. Equipment includes a 13.2kV-480Y/277V pad mount transformer, 480Y/277V switchboard, 480V-208Y/120V step down transformer, and a 208Y/120V switchboard. Additional electrical equipment and devices as specified. Each successful Bidder will be required to furnish corporate Surety Bonds in an amount equal to one hundred percent (100%) of its Contract price. Said Bonds shall be issued by a responsible Surety approved by the Des Moines Airport Authority and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the Des Moines Airport Authority from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of one (1) year from and after acceptance of the Contract. All proposals submitted in accordance with the instructions presented herein will be subject to evaluation. Bids may be held by the Des Moines Airport Authority for a period not to exceed 30 days from the date of the bid opening for the purpose of conducting the bid evaluation. Prospective Bidders are hereby advised that award of contract is contingent upon the Owner receiving Federal funding assistance under the Airport Improvement Program. Awarded Bidder may be required to hold their bid open for a period of up to 120 days following letting. The Owner will base the award of contract upon the lowest aggregate sum proposal submitted from those bidders the Owner confirms as being responsive and responsible. The right is reserved, as the Des Moines Airport Authority may require, to reject any and all bids and to waive any informality in the bids received. This project shall be fully completed no later than December 1, 2023. The Des Moines Airport Authority reserves the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the Authority.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents