Similar Projects
Phase 5 School Bond Renovation
Renovation, Addition
Conception
Arlington, TX

New Elementary School Cedar Creek
New Construction
Conception
Cedar Creek, TX

W W Bushman Elementary School
Renovation
Design
Dallas, TX 75216

Phase 3 School Bond Renovation
Renovation, Demolition
Design
Arlington, TX 76010

IDEA Public Schools - 2022A Bond Projects - IDEA Pharr-Phase III
New Construction, Infrastructure - 25,748 SF
Bidding
$6,000,000 est. value
Pharr, TX 78577

Austin Achieve Pflugerville - Bid Package 2
New Construction - 85,000 SF
Bidding
$18,000,000 est. value
Pflugerville, TX 78660

Austin Achieve Pflugerville Elementary School Project
New Construction - 85,000 SF
Sub-Bidding
Austin, TX 78723

Construction Manager-at-Risk Responsive Educational Solutions
Renovation, Addition - 61,500 SF
Post-Bid
Conroe, TX 77384

Northampton Elementary School Renovations
Renovation - 20,000 SF
Post-Bid
$1,411,884 est. value
Spring, TX 77389

Building Renovations
Renovation
Results
Dallas, TX 75223

Barbara Jordan Elementary School - Addition and Renovation
Renovation, Addition
Results
$8,313,366 est. value
Dallas, TX 75219

New Elementary School in the Caney Creek Feeder Zone - Flex School #20
New Construction
Construction
Less than $28,075,000 est. value
Conroe, TX

2019 Fiest Elementary School Renovation
Renovation, Addition - 3,350 SF
Construction
Less than $11,750,000 est. value
Houston, TX 77000

Blanton Elementary School Improvements
Renovation
Pending Verification
Carrollton, TX 75006

Davis Elementary School Improvements
Renovation
Pending Verification
Carrollton, TX 75007

Reported 05/12/2022 05:43 AM
Project Title

Pecos 2nd - 5th New Elementary School

Physical Address View project details and contacts
City, State (County) Pecos, TX 79772   (Reeves County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $45,157,301
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a new, ground-up two story 133,575 SF 1st – 2nd Elementary School, along with roughly 43,059 SF of demolition of the current Maintenance Building on the same site.

Details

,, 176,634 SF - Elementary School, 133,575 SF New Construction, Elementary School, 43,059 SF Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents