Similar Projects
New Operations Facility - Bathroom Addition/Renovation
New Construction, Renovation, Addition
Conception
$35,000,000 to $40,000,000 est. value
Sumner, WA 98390

NAVFAC Northwest 8(a) Small Multiple Award Construction Contract (MACC) Regional Contract
New Construction, Renovation, Demolition, Alteration
Bidding
$10,000,000 to $100,000,000 est. value

RFP - Environment and Sustainability Action Plan
Term Contract
Bidding
$100,000 CJ est. value
Puyallup, WA 98371

Husky Terminal Pavement Repairs 2022
Term Contract
Sub-Bidding
$530,000 CJ est. value
Tacoma, WA 98421

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

Design-Build Services Tacoma Online Learning - Tenant Improvements
Renovation - 12,961 SF
Results
$5,000,000 est. value
Tacoma, WA 98402

Animal-Related Business Inspections
Term Contract
Post-Bid
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Communication Plan and Engagement Activities
Term Contract
Post-Bid
WA

Countywide Machine Shop Services
Term Contract
Results
WA

On-Call Title and Escrow Services
Term Contract
Post-Bid
WA

USPS IQ JOC Washington
New Construction, Renovation
Results
Less than $10,000,000 est. value

Biosolids Beneficial Use Services
Term Contract
Post-Bid

Last Updated 08/03/2022 08:07 AM
Project Title

Non Electrical Hardware

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98405   (Pierce County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Misc. Buildings, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bidder/Proposer acknowledges and agrees that the terms and conditions stated herein shall control and prevail over any other conflicting terms and conditions Bidder/Proposer may present in connection with this Contract. bids/proposals or any part thereof, and if necessary, call for new bids/proposals (3) to waive any informality in the bids/proposals, and (4) to accept the bid/proposal that is the lowest and the best bid/proposal in the interest of the City of Tacoma. B.The City reserves the right to correct ambiguities and obvious errors in the Bidder/Proposer's proposal. In this regard, if the unit price does not compute to the extended total price, the unit price shall govern. C.In the evaluation of bids/proposals, the Bidder's/Proposer's experience, delivery time, and responsibility in performing other contracts will be considered. In addition, the bid/proposal evaluation factors set forth in TMC Section 1.06.253 may be considered by the City as well as the tax revenue the City would receive from purchasing item(s) from a supplier or suppliers located inside or outside the boundaries of the City of Tacoma.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents