Similar Projects
Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

PS 163X New Building and Demo of Existing Building
Demolition
Bidding
$4,000,000 est. value
Bronx, NY 10457

Demolition and Site Restoration at Orange County Transfer Station 2
Demolition, Infrastructure
Bidding
Newburgh, NY 12550

Demolition and Disposal
Demolition
Post-Bid
Stanfordville, NY 12581

Bay Village Pump Station Replacement (REDI MO.64)
Post-Bid
Rochester, NY 14617

Trunk Sewer Main and Pump Station Reconstruction
Results
Less than $4,700,000 est. value
Peru, NY 12972

2020 Controlled Demolition and Abatement of Multiple Structures
Demolition
Results
Amsterdam, Schenectady, NY

Sanitary Wastewater Pump Station Upgrades General Construction
Renovation
Construction
Saratoga Springs, NY

GC Phase 2 Water Supply Contract 3C and 3D: Golden Road Pump Station
Renovation
Construction
NY

Reconstruction of Clearview Pumping Station
Renovation
Bidding
$21,492,605 to $29,078,230 est. value
Flushing, NY

Demolition of One Structure
Demolition
Post-Bid
Hunter, NY

Provide Wedgewire Screen and Pump Station Upgrades
Results
$10,250,000 to $15,500,000 est. value
Albany, NY 12203

Lab Of Ornithology Warehouse Demolition
Demolition
Construction
$35,000 est. value
Ithaca, NY 14850

Downs Property Demolition
Demolition
Bidding
East Hampton, NY 11937

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Reported 03/12/2022 12:00 AM
Project Title

Steamboat Landing Pump Station Replacement

Physical Address View project details and contacts
City, State (County) Old Forge, NY 13420   (Herkimer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Demolition, Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes demolition and replacement of an existing sanitary sewer pump station (air injection-type) with a submersible-type pump station, and the addition of a manual transfer switch for a portable electrical generator.

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Packaged Generator Assemblies.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents