Similar Projects
Fort Jesse Tank Rehabilitation
Alteration
Bidding
Normal, IL 61761

Eagle Point Bay 200,000 Gallon Elevated Tank Rehabilitation
Infrastructure
Bidding
$415,000 est. value
Marion, IL

Water Tower Cleaning
Term Contract
Post-Bid
Oswego, IL 60543

Water Tower Cleaning
Post-Bid
Colona, IL

Elevated Water Storage Tank
Results
Gardner, IL 60424

Elevated Tank Improvements
Results
Pecatonica, IL 61063

Water Tower Painting and Miscellaneous Repair
Infrastructure, Alteration
Bidding
Woodridge, IL 60517

New 250,000 Gallon Elevated Water Storage Tank
Post-Bid
Less than $1,310,000 est. value
Carrollton, IL

State Street And Seven Hills Elevated Water Storage Tanks Rehabilitation
Renovation
Results
O'Fallon, IL 62269

Four Flaggs Tank Rehab, Painting and Tower Facilities Lightning Protection and Oriole Tower Lightning Protection
Infrastructure, Alteration
Bidding
Niles, IL 60714

Protective Coating Restoration for 500,000 Gallon Elevated Water Storage Reservoir Along with Ground Storage Reservoir and Miscellaneous Concrete at Water Treatment Plant
Post-Bid
Centralia, IL

Water Tank, Hydronic Pump and Vav Box Upgrades at Independence Grove
Results
Libertyville, IL 60048

Potable Water Reservoir
Infrastructure
Bidding
Broadview, IL 60155

Water System Improvements Division 2: Water Tower Rehabilitation
Post-Bid
Blue Mound, IL

First Street Water Treatment Plant Brine Tank Replacement
Renovation
Results
Less than $480,000 est. value
Woodstock, IL 60098

Last Updated 12/07/2021 02:39 PM
Project Title

New Elevated Water Storage Tank (Oakton and Busse)

Physical Address View project details and contacts
City, State (County) Elk Grove Village, IL   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,286,862
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new elevated water storage tank, water main, access drive, storm sewer and underground detention facility at the southwest corner of Busse Road and Oakton Avenue

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents