Similar Projects
Eastway Regional Recreation Center
New Construction - 97,000 SF
Post-Bid
Charlotte, NC

North Carolina Zoological Park Building Improvements
Renovation
Post-Bid
Asheboro, NC

Wake County Parks Renovation - Historic Oak View County Park
Renovation
Results
Raleigh, NC 27610

Improvements and Repairs Town Hall, Police Department and Recreation Facilities
Results
Less than $500,000 est. value
Cramerton, NC 28032

St. Luke Catholic Church - Phase 1A Sitework, Recreation Shelter and Rectory
New Construction - 3,884 SF
Construction
$1,500,000 est. value
Charlotte, NC 28277

Revolution Mill Fitness Relocation
Renovation - 8,238 SF
Construction
Greensboro, NC 27405

Owner's Representative
Post-Bid
Raleigh, NC

Walnut Creek Athletic Complex Tower Renovations Project
Renovation
Results
Less than $728,360 est. value
Raleigh, NC 27610

Kitchen Renovation at Ellis Park
Renovation
Construction
Salisbury, NC 28144

New Hayesville Public Schools Concession Stands
New Construction
Post-Bid
Hayesville, NC 28904

Randolph Johnson Park Improvements
Results
Beaufort, NC

Raleigh Amphitheater Seasonal Repairs/Upgrades
Post-Bid
Raleigh, NC 27601

Design and Construction Services for East Clayton Community Park - Bathroom Facility and Picnic Shelters
Results
Less than $700,000 est. value
Clayton, NC

Bleacher Replacement at Four Schools
Post-Bid
Fayetteville, NC

Picnic Shelter and Related Amenities
Results
Less than $15,600 est. value
NC

Reported 12/03/2019 02:34 PM
Project Title

Piper Cox House Repairs at Eno State Park

Physical Address View project details and contacts
City, State (County) Durham, NC 27705   (Durham County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method
Project Status Construction Commenced July 2019
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Extend existing office partition walls to ceiling above without damaging existing historic fabric. A. Furnish all labor and materials necessary for the complete installation of all brick masonry work. B. Brick masonry work complete with reinforcement, anchorage, bond beams and rebuild of existing brick chimneys. C. Solid brick for exterior wall construction complete with required through wall flashings. D. Mortar Analysis must be performed, and new mortar must match existing in color and chemical composition. E. Cut and fit all masonry for work as required. F. Protect existing windows from damage by masonry work. G. Masonry contractor shall follow existing chimney construction as close as possible. H. Masonry contractor shall re-point existing mortar joints in chimney as required where mortar is missing.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents