Similar Projects
Bushwick Roof Reconstruction
Renovation
Sub-Bidding
$1,000,000 CJ est. value
New York, NY 11207

Roofing Replacement and Rooftop Structure Renovation at Hughes Apartments
Renovation
Sub-Bidding
$600,000 CJ est. value
New York, NY 11216

Woodhull 5th Floor Roof Replacement
Alteration
Post-Bid
$4,500,000 to $5,000,000 est. value
Brooklyn, NY 11206

Coney Island Hospital 3rd Floor Roof Replacement
Alteration
Post-Bid
$700,000 to $800,000 est. value
Brooklyn, NY 11235

Brooklyn Children's Psychiatric Center Roof Replacement
Alteration
Results
$5,850,000 to $6,000,000 est. value
Brooklyn, NY 11233

Garage Roof Repair
Alteration
Results
Brooklyn, NY

Roofing, Railing Replacement and Rooftop Structure at Seth Low House
Alteration
Post-Bid
Brooklyn, NY 11212

Parkside Avenue Roof Replacement and Asbestos Abatement
Alteration
Results
$210,000 to $225,000 est. value
NY 11226

Building Roof Replacements at Seven (7) LNA Service Stations Located in NJ, NY & PA
Alteration
Post-Bid

Leonard Branch Library HVAC and Roof Replacement
Alteration
Results
Brooklyn, NY 11211

OMH Brooklyn Children's Psychiatric Center Emergency Roof Repairs
Renovation
Post-Bid
$300,000 CJ est. value
New York, NY 11233

Passages Academy Exterior Masonry/Roofs/Windows/Parapets
Renovation
Results
$4,000,000 est. value
Brooklyn, NY 11207

Job Order Contracting - Area 1 and 2
Alteration
Results
$2,000,000 to $3,000,000 est. value

Woodhull Auditorium Roof Replacement
Alteration
Results
$850,000 to $950,000 est. value
Brooklyn, NY 11206

Windows, Roofs, Parapets, Ext Masonry, Flood Elimination
Alteration
Results
$4,000,000 est. value
Brooklyn, NY 11208

Last Updated 04/08/2023 03:02 PM
Project Title

Replace R-22 Air Handling Units Critical Care Units

Physical Address View project details and contacts
City, State (County) New York, NY 11203   (Kings County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $10,464,042 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this specification shall include but is not limited to the following: Attend necessary job meetings and furnish competent and full time supervision, experienced roof mechanics, all materials, tools, and equipment necessary to complete, in an acceptable manner, the roof installation in accordance with this specification. Comply with the latest written application instructions of the manufacturer of the primary roofing products. In addition, application practice shall comply with requirements and recommendations contained in the existing roofing warranty. A roof membrane assembly consisting of two plies of a prefabricated, reinforced, homogeneous Styrene-Butadiene-Styrene (SBS) block copolymer modified asphalt membrane, applied over a prepared substrate. Reinforcement mats shall be impregnated/saturated and coated each side with SBS modified bitumen blend. The cross sectional area of the sheet material shall contain no oxidized or non-SBS modified bitumen. The roof system shall pass 500 cycles of ASTM D 5849 Resistance to Cyclic Joint Displacement (fatigue) at 14F (-10C). Passing results shall show no signs of membrane cracking or interply delamination after 500 cycles. The roof system shall pass 200 cycles of ASTM D 5849 after heat conditioning performed in accordance with ASTM D 5147. The assembly shall possess waterproofing capability, such that a phased roof application, with only the modified bitumen base ply in place, can be achieved for prolonged periods of time without detriment to the watertight integrity of the entire roof system. Modular sealing-element unit, designed for field assembly, for filling annular space between piping and sleeve. 1. Designed to form a hydrostatic seal of 20 psig minimum. 2. Sealing Elements: EPDM-rubber interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe. 3. Pressure Plates: Carbon steel. 4. Connecting Bolts and Nuts: Carbon steel, with ASTM B633 coating of length required to secure pressure plates to sealing elements. A. Suspended Ceiling System consisting of main runners and cross runner tees snapped together to form modules or grids for the installation of lay-in acoustical tiles or panels, air diffusers, and light fixtures. B. Structural Performance and Suspension System Types: 1. Type HD/EG: Heavy duty, direct hung, exposed grid. (Minimum load carrying capability of main runners: 16 lb/lin ft). The Contractor shall complete all work necessary for substantial completion within 674 calendar days from receipt of the Notice to Proceed. The Funds project specific goals for this project are 18% MBE and 12% WBE and 6% SDV. The Fund waives fees and deposits for sets of the Contract Documents requested by NYS certified Minority- and Women-Owned Business Enterprise or Service-Disabled Veteran-Owned Business Enterprise. Bids must be submitted in duplicate in accordance with the instructions contained in the Information for Bidders. Security will be required for each bid in an amount not less than five (5) percent of the Total Bid. Each bid must be identified, on the outside of the envelope, with the name and address of the bidder and designated a bid for the Project titled above. When a sealed bid is placed inside another delivery jacket, the bid delivery jacket must be clearly marked on the outside BID ENCLOSED. It is the policy of the State of New York and the Fund to encourage minority/womens business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. The Fund reserves the right to reject any or all bids. Bidders who register as a plan holder through the Printer may acquire the bidding and contract documents using the following options: 1. For a non-refundable fee of ten dollars ($10), interested firms may request and receive an electronic download of the bidding and contract documents. At the bidder's expense, purchase a printed copy or copies of the bid set. 2. For a non-refundable fee of ten dollars ($10), interested firms may request and receive a CD with electronic copies of the bidding and contract documents. At the bidder's expense, purchase a printed copy or copies of the bid set

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents