Similar Projects
SandMU; Tyger River CI - Replace Upper and Lower Yard Kitchen Boilers
Renovation
Sub-Bidding
$90,000 CJ est. value
Enoree, SC 29335

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Jesse Boyd Kitchen Hood Replacement
Results
Spartanburg, SC 29307

USC Upstate Smith Science Building Renovations
Results
$4,600,000 to $5,200,000 est. value
Spartanburg, SC 29303

Roof Mounting Exhaust Fans
Alteration
Post-Bid
Spartanburg, SC 29306

Installation of Bi-Polar Ionization Systems
Results
Duncan, SC

New HVAC System for Meter Shop
Alteration
Post-Bid
Spartanburg, SC

Variable Volume HVAC System
Alteration
Results
Spartanburg, SC

SCC - BMW Office Facility HVAC
Alteration
Post-Bid
$60,000 to $70,000 est. value
Duncan, SC 29334

Byrnes High School Cooling Tower Replacement
Alteration
Results
Duncan, SC 29334

HVAC Filters
Alteration
Post-Bid
Spartanburg, SC

Tyger River Kitchen Hood Repair
Alteration
Results
Enoree, SC 29335

HVAC Unit
Alteration
Results
Enoree, SC 29335

HVAC Filter Replacement
Alteration
Results
SC

Last Updated 09/15/2022 02:03 AM
Project Title

Removal and Replacement of HVAC System

Physical Address View project details and contacts
City, State (County) Spartanburg, SC 29306   (Spartanburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Spartanburg is seeking proposal from vendors to provide construction services for Removal and Replacement of the HVAC at 100 North Liberty Street Spartanburg, SC. All work to comply with the specifications developed by the city to provide quality workmanship. Pre-bid meeting held at 305 W Henry St, Spartanburg, SC at 10:00 am Submit all questions in writing to: No questions will be answered verbally. Tony McAbee Building Maintenance Manager City of Spartanburg tmcabee@cityofspartanburg.org General The purpose of this work is to provide construction services for the Removal and Replacement of the HVAC system at 100 North Liberty Street Construction Phase Furnish and install the following equipment and materials: Removal of existing 3-ton split HVAC system Install 3 Ton 14 SEER R410-A 230V/ 3 phase outdoor Heat Pump on the roof condensing unit Install 3 Ton 14 SEER R410-A Split Heat Pump Air Handler in the overhead drop ceiling Aux Heater Kit Liquid Line Bi-Flow Drier Pre-Fab Condenser Pad 500 Micron Vacuum New Aux Drain Pan with Safety Float Switch Flow nitrogen during brazing Charge with New R410-A to Superheat/Subcooling Duct Transition SS-2 Float Switch for Secondary Drain Use Current Honeywell Digital Thermostat Disconnect & Whip Crane Service & Traffic Control Remove/Replace Ceiling Section Permit & Inspection by Local Jurisdiction Complete installation and start-up. Complete cleanup of area after installation. NOTES: PROVIDE HVAC SYSTEM STANDARD WARRANTY

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents