Similar Projects
Mixed-Use Development
New Construction, Renovation - 211,420 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Sacramento, CA 95814

Seasons At Montelena
New Construction - 1,400 SF
Conception
$10,000,000 CJ est. value
Rancho Cordova, CA 95742

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Valley Rail Project / Altamont Corridor Express- San Joaquin Joint Power Authority
Infrastructure
Design
$404,000,000 CJ est. value
Sacramento, CA 95814

Folsom Hydraulic Cylinder Replacement (HCR)
Infrastructure
Bidding
$25,000,000 CJ est. value
Folsom, CA 95630

RFP Engineering - Laguna Creek Inter-Regional Trail Crossing at State Route 99 Project
Infrastructure
Bidding
$6,320,000 CJ est. value
Elk Grove, CA 95624

Modify Ramp Metering Systems
Infrastructure
Post-Bid
CA

West Silver Eagle Bridge and Overhead Joint Repair
Renovation, Infrastructure
Post-Bid
$565,560 est. value
Sacramento, CA 95834

Sierra Highway Sidewalks
Infrastructure
Results
$375,000 est. value
Sacramento, Santa Clarita, CA 91390

Modify Ramp Metering Systems
Infrastructure
Results
$910,000 est. value
Sacramento, CA 95811

3S Apartments
Demolition, New Construction, Infrastructure - 2,300 SF
Construction
$71,500,000 CJ est. value
Sacramento, CA 95811

Sunrise Mall Redevelopment
New Construction, Infrastructure - 695,000 SF
Pending Verification
$400,000,000 CJ est. value
Citrus Heights, CA 95610

Ice Box
New Construction, Infrastructure - 79,190 SF
Pending Verification
$25,000,000 CJ est. value
Sacramento, CA 95811

Tuscan Neighborhood Park - WCE901 - City of Elk Grove
Infrastructure
Conception
$5,383,000 CJ est. value
Elk Grove, CA 95624

Poppy Grove Apartments
New Construction, Infrastructure
Design
$145,000,000 CJ est. value
Elk Grove, CA 95757

Last Updated 09/28/2022 01:36 PM
Project Title

Murphy Property Subdivision

Physical Address View project details and contacts
City, State (County) Vineyard, CA 95829   (Sacramento County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $66,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a residential subdivision. As of September 28, 2022, this project is pending a time extension that will expire on March 12, 2024. A hearing date has not been scheduled for county approval. Information regarding the selection of an architect and general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the fourth quarter 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents