Similar Projects
Aggregate Materials for Highlands County Asphalt Plant
Term Contract
Post-Bid
Sebring, FL 33875

Soil Cement Pugmill Mix
Term Contract
Post-Bid
Viera, FL 32940

Road Base Rock-Buckskin Trail
Results
Ochopee, FL 34141

Purchase of Shell Rock Material, FDOT Base Coquina Rock and General Fill Material
Term Contract
Results
Fort Pierce, FL 34982

Chassahowitzka WMA Limerock
Term Contract
Post-Bid
Brooksville, FL 34614

Coarse Aggregate for Orange County Utilities Department
Term Contract
Results
Orlando, FL 32801

Base Material, Lime Rock and/or Shell Rock
Post-Bid
Palatka, FL 32177

Riprap and Shell Rock Delivery to STA 3/4
Results
$352,070 to $389,130 est. value
West Palm Beach, FL 33406

Supply Limerock/Shell/Shell Rock to Lake Apopka Wildlife Drive and/or Fellsmere Grade
Post-Bid
Apopka, FL 32703

Caravelle Ranch Wildlife Management Area Road Material
Results
Less than $150,000 est. value
Palatka, FL 32177

Florida Department of Transportation (FDOT) Compliant Limerock Stabilized Base
Post-Bid
Brooksville, FL 34601

Select Fill Material (Dirt) for Backfill (Sheltered Market Solicitation)
Term Contract
Results
Tampa, FL 33602

Shell/Rock Material - Annual Contract
Term Contract
Post-Bid
Port Charlotte, FL 33948

Rock Crushing
Results
Ochopee, FL

Aggregate Materials
Post-Bid
Crawfordville, FL 32326

Last Updated 10/20/2020 03:32 PM
Project Title

Asphalt Crushing and Milling Material Services

Physical Address View project details and contacts
City, State (County) Brooksville, FL   (Hernando County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All millings will be loaded into a crusher and processed such that the product will pass through a 1 ½ inch sieve. The County will provide the milling material at the site located off Cobb Road, Brooksville, Florida. The Contractor is responsible for all the labor, equipment and material necessary to load, crush and discharge the milling material. The Contractor is not responsible for transporting the milling material. A minimum of 10,000 tons will be provided per work order.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving Rehabilitation, Cold Milling Asphalt Paving, Aggregate Surfacing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents