Similar Projects
2,000,000 Gallon Elevated Water Storage Tank (Main Pressure Zone) Bald Mountain
Renovation
Conception
$8,690,000 CJ est. value
Hot Springs National Park, AR 71901

Z--Paint Inside and Outside of Water Tanks
Term Contract
Design
$100,000 to $250,000 est. value
Harrison, AR

Fulton County Water Authority, Phase V Extensions
Infrastructure
Bidding
$5,000,000 CJ est. value
Salem, AR 72576

Water Treatment Plant Improvements 4.0 MG Composite Elevated Storage Tank
Infrastructure
Bidding
$4,297,000 CJ est. value
Rogers, AR 72756

Rehabilitate an Existing 150,000-Gallon Elevated Water Storage Tank
Infrastructure
Post-Bid
Mountain View, AR

Water System Improvements
Renovation
Post-Bid
Kingsland, AR 71652

Construction – Round Mountain Standpipe
Infrastructure
Results
Fayetteville, AR 72701

East End 2021 Water Improvements Contract 1 – Water Storage Tank
Infrastructure
Results
Little Rock, AR

Water Treatment Plant Improvements - 3 MG Clearwell
Infrastructure
Bidding
$10,867,000 CJ est. value
Rogers, AR 72756

Water System Improvement - Contract II - Storage Tank Rehabilitation
Infrastructure
Post-Bid
Chidester, AR

Township Tank Improvements
Infrastructure
Results
Fayetteville, AR

Construction of an 810,000-Gallon Clearwell
Infrastructure
Post-Bid
Bull Shoals, AR

Tank Painting and Rehab
Term Contract
Results
Cabot, AR 72023

Water System Improvements
Infrastructure
Post-Bid
AR

Fish Hauling Tanks
Infrastructure
Results
Little Rock, AR

Last Updated 09/13/2022 06:33 PM
Project Title

2,500,000 Gallon Elevated Water Storage Tank (Main Pressure Zone) Highway 70 - City of Hot Springs

Physical Address View project details and contacts
City, State (County) Hot Springs, AR 71913   (Garland County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $5,180,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined Project is included in the City of Hot Springs' FY 2022 Budget CIP. Per the owner, as of September 13, 2022, they do not have any plans to build the tank yet. A timeline for construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents