Similar Projects
Philmnt/Tomlinson/Pine Road Intersection
Infrastructure
Conception
Huntingdon Valley, PA 19006

North Narberth Avenue O/AMTRAK
New Construction, Infrastructure
Design
Narberth, PA 19072

23 Moore to Geerdes
Infrastructure
Design
King of Prussia, PA 19487

2022 Curb Line Milling Project
Infrastructure
Bidding
Blue Bell, PA

Milling
Infrastructure
Bidding
Horsham, PA

High Friction Surface Treatment Services
Post-Bid
Less than $25,000 est. value
Huntingdon Valley, PA

Coach Mcnelly Stadium - Egress Enhancements
Post-Bid
Royersford, PA 19468

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2020 Road Projects
Results
Collegeville, PA 19426

Ridge Pk Norris-Butler (W)
Infrastructure
Design
PA

2022 Liquid Fuels Road Program
Infrastructure
Bidding
$300,000 est. value
West Point, PA

Paving Restoration at Whitemarsh Elementary School, Ridge Park Elementary School and Plymouth Elementary School
Infrastructure
Post-Bid
$560,000 est. value
Lafayette Hill, PA 19444

2020 Contracted Milling/Paving and Line Painting
Results
Horsham, PA 19044

Group 6-21-M11
Infrastructure
Bidding
$10,000,000 to $12,499,999 est. value
Harleysville, PA

Roadway and Bridge Reconstruction
Infrastructure
Post-Bid

Reported 04/14/2022 12:00 AM
Project Title

2022 Road Improvements Project

Physical Address View project details and contacts
City, State (County) Skippack, PA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work along roadways will include: Collegeville Road - Landis Rd to Meetinghouse Rd/ Landis Rd Intersection Improvement Remove Storm Sewer Inlet (3EA), Remove 18aEUR Storm Sewer Pipe(365LF), 18aEUR HDPE Pipe or 18aEUR RCP in lieu of 18aEURHDPE (500LF), 2aEUR(TM)x4aEUR(TM) Inlet C Top (4EA), 2aEUR(TM)x4aEUR(TM) Inlet M Top (4EA), 18aEUR DW Endwall (1EA), Extended Existing Pipe 15aEUR RCP (6LF), 7aEURx8aEUR x18aEUR Concrete Curb (134LF), 5aEUR(TM) Concrete Curb Taper (20LF), 4aEURConcrete ADA Ramp-Truncated Dome Panel (2EA), Saw Cut Landis Road (24LF), 1A 1/2 aEUR Milling- Landis Road (485SY), Leveling Course-Landis Road (50Tons), 1A 1/2 aEUR Overlay-Landis Road (485SY), 1A 1/2 aEURMilling-Collegeville Road (13,445SY), 5aEUR Base Report-Collegeville Road (100SY), Leveling Course-Collegeville Road (100Tons),1A 1/2 aEUR Overlay - Collegeville Road (13,445 SY) Evansburg Road - Kratz Road to Route 73 2aEUR(TM)x4aEUR(TM) Inlet M Top (3EA), 4aEUR(TM) Storm Manhole (1EA), 18aEUR DW Endwall (1EA), 18aEUR HDPE Pipe or 18aEU RCP in lieu of 18aEURHDPE, (504LF), Driveway Restoration Full Depth (87SY), Roadway Restoration at Hailey Way (115SY), Reset Mail Boxes as needed (5EA), 1A 1/2 aEUR Milling (8,160SY) 5aEUR Base Repair-25mm (100SY) 1A 1/2 aEUR 9.5mm Wearing Course (8,160SY), Leveling Course (50Tons), Traffic Control (1LS)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents