Similar Projects
Independent Senior Living Apartments, Memory Care and Assisted Living Facilities
New Construction, Renovation, Addition, Demolition - 113,438 SF
Conception
Wyandotte, MI 48192

Fowler Building
Renovation - 51,675 SF
Conception
Detroit, MI 48226

Brightdawn Village Condominiums
New Construction - 956,000 SF
Design
$32,000,000 est. value
Ann Arbor, MI 48104

Pope Francis Center: Bridge Housing (Short-Term Housing Project)
New Construction - 60,536 SF
Design
Detroit, MI 48208

Clark Commons - Phase II: Apartments
New Construction
Post-Bid
Flint, MI 48503

Downie Street Cottages
New Construction
Post-Bid
Alma, MI 48801

Developer Qualifications 410 East Drive
Results
Marshall, MI

Howard Estates Apartments Kitchen Renovations
Renovation
Results
Flint, MI 48500

Metro Place
New Construction - 106,400 SF
Construction
$25,000,000 est. value
Lansing, MI 48933

Book Tower & Book Building Redevelopment
Renovation - 517,000 SF
Construction
$313,000,000 est. value
Detroit, MI 48226

Valhalla Ann Arbor
New Construction, Demolition
Pending Verification
$100,000,000 est. value
Ann Arbor, MI 48103

Palmer Road Garden Apartments
Renovation - 6,000 SF
Pending Verification
$200,000 est. value
Westland, MI 48186

Martineau Apartments
Renovation
Conception
$3,800,000 est. value
Grand Rapids, MI 49503

23 Mile Road - Adult Senior Living Apartments
New Construction
Design
Macomb, MI 48042

Newton Place
New Construction - 105,849 SF
Post-Bid
$10,000,000 CJ est. value
Okemos, MI 48823

Last Updated 11/08/2021 09:58 AM
Project Title

Pennridge Trail North - Phase 2

Physical Address View project details and contacts
City, State (County) Portage, MI 49024   (Kalamazoo County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method
Project Status Permitting, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

11 Duplex buildings for total of 22 units. Units 23-74.

Details

11 Apartments/Condominiums, 1 Story Above Grade, New Construction, 2 Units per Building.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents