Last Updated | 01/05/2024 02:46 PM |
Project Title | RFP Engineering - Design Groups 23-03 and 23-04 |
Physical Address | View project details and contacts |
City, State (County) | Marianna, FL 32448 (Jackson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected October 2024 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $1,490,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of January 5, 2024, engineer firms have been selected for both projects and they are in design. Contractor lettings will be released separately for each project and are scheduled in 2024. A firm timeline for construction has not been established; however, construction is anticipated to begin 3-4 months after each letting. A detailed scope has not yet been released. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 03 Selection Method : Letter of Response and Abbreviated Technical Proposal Financial Management Numbers : 21916533201 21934623201 43078223201 43973813201 Design Groups 23-03 and 23-04 TRC Members (Subject to Change) : John Whittington Lisa Bell Ryan Adams Design Group 23-03 and 23-04 in Jackson and Holmes Counties. Design Group 23-03: SR 71 from N of CR 165 Basswood Rd to N of 5th St and SR 166 Caverns Rd from Chipola River Bridge to SR 71. Design Group 23-04: SR 79 from SR 10 (US 90) to North of CR 177 and SR 77 Cotton Street from South of Brown Street to North of College Drive. The letter of response and technical proposal should address the projects in Design Group 23-03 only. The Consultant ranked 1st will receive Group 23-03 in Jackson County estimated at $1,490,000. The project manager for this group is Lisa Bell Mitchell. The projects are SR 71 from N of CR 165 Basswood Rd to N of 5th St and SR 166 Caverns Rd from Chipola River Bridge to SR 71. The Consultant ranked 2nd will receive Group 23-04 in Holmes and Jackson Counties estimated at $1,295,000. The project manager for this group is Howard Hodge. The projects are SR 79 from SR 10 (US 90) to North of CR 177 and SR 77 Cotton Street from South of Brown Street to North of College Drive. Financial Management Number(s) Design Group 23-03: 43078223201 and 43973813201 Design Group 23-04: 21916533201 and 21934623201 Shortlist Selection Date/Time 4/26/2022 Phase II Submittal Deadline Date/Time 5/24/2022 Final Selection Date/Time 6/13/2022 Negotiations Period Begin Date 6/14/2022 Negotiations Period Ending Date 8/09/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Design Groups 23-03 and 23-04 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |