Similar Projects
South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Gabion Installation - Jackson, Washington
Infrastructure
Bidding
$750,000 CJ est. value
Marianna, FL 32448

Gabion Installation - Jackson, Washington
Infrastructure
Bidding
$750,000 CJ est. value
Marianna, FL 32448

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP - Continuing Services Traffic Operations Design Consultant
Term Contract
Post-Bid
$5,000,000 CJ est. value
Santa Rosa Beach, FL 32459

Silicone Joint Sealer
Infrastructure
Results

Tara Estates Subdivision Sewer Extension
Infrastructure
Results
$2,095,000 CJ est. value
Marianna, FL 32446

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Apalachee Solar Energy Center
Infrastructure
Pending Verification
$88,431,500 CJ est. value
Marianna, FL 32446

New Resiliency Hub - City of Marianna
New Construction, Infrastructure
Pending Verification
$5,207,000 CJ est. value
Marianna, FL 32446

Watson Street Drainage Improvements
Infrastructure
Bidding
$680,000 CJ est. value
Marianna, FL 32446

6th Avenue / Mill Creek Road Resurfacing Project
Infrastructure
Post-Bid
$850,000 CJ est. value
Graceville, FL 32440

Resurfacing - SR 75 (Us 231)
Infrastructure
Results
$4,849,503 CJ est. value
Cottondale, FL 32431

Old Spanish Trail Roadway Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Grand Ridge, FL 32442

Last Updated 01/05/2024 02:46 PM
Project Title

RFP Engineering - Design Groups 23-03 and 23-04

Physical Address View project details and contacts
City, State (County) Marianna, FL 32448   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected October 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,490,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 5, 2024, engineer firms have been selected for both projects and they are in design. Contractor lettings will be released separately for each project and are scheduled in 2024. A firm timeline for construction has not been established; however, construction is anticipated to begin 3-4 months after each letting. A detailed scope has not yet been released. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 03 Selection Method : Letter of Response and Abbreviated Technical Proposal Financial Management Numbers : 21916533201 21934623201 43078223201 43973813201 Design Groups 23-03 and 23-04 TRC Members (Subject to Change) : John Whittington Lisa Bell Ryan Adams Design Group 23-03 and 23-04 in Jackson and Holmes Counties. Design Group 23-03: SR 71 from N of CR 165 Basswood Rd to N of 5th St and SR 166 Caverns Rd from Chipola River Bridge to SR 71. Design Group 23-04: SR 79 from SR 10 (US 90) to North of CR 177 and SR 77 Cotton Street from South of Brown Street to North of College Drive. The letter of response and technical proposal should address the projects in Design Group 23-03 only. The Consultant ranked 1st will receive Group 23-03 in Jackson County estimated at $1,490,000. The project manager for this group is Lisa Bell Mitchell. The projects are SR 71 from N of CR 165 Basswood Rd to N of 5th St and SR 166 Caverns Rd from Chipola River Bridge to SR 71. The Consultant ranked 2nd will receive Group 23-04 in Holmes and Jackson Counties estimated at $1,295,000. The project manager for this group is Howard Hodge. The projects are SR 79 from SR 10 (US 90) to North of CR 177 and SR 77 Cotton Street from South of Brown Street to North of College Drive. Financial Management Number(s) Design Group 23-03: 43078223201 and 43973813201 Design Group 23-04: 21916533201 and 21934623201 Shortlist Selection Date/Time 4/26/2022 Phase II Submittal Deadline Date/Time 5/24/2022 Final Selection Date/Time 6/13/2022 Negotiations Period Begin Date 6/14/2022 Negotiations Period Ending Date 8/09/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Design Groups 23-03 and 23-04

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents