Similar Projects
Falcon Center Pool Resurfacing
Infrastructure
Bidding
$170,000 CJ est. value
Fairmont, WV 26554

Middletown Commons Redevelopment Project No 1 Contract 1-A Site Roadways Project
Post-Bid
Whitehall, WV

Paving of Locust Avenue and Baltimore Street
Infrastructure
Post-Bid
Mannington, WV 26582

Annabelle Bridge
New Construction, Infrastructure
Results
WV

Road Repair and Repaving Project 2021
Infrastructure
Results
$197,000 est. value
White Hall, WV

Fairmont Coke Works-Sharon Steel Redevelopment
Infrastructure
Post-Bid
Fairmont, WV

Paving at Mary Lou Retton Youth Park
Infrastructure
Results
Fairmont, WV 26554

Milling and Paving for City of Fairmont Streets
Infrastructure
Post-Bid
Fairmont, WV

Squibb Wilson Boulevard Paving
Infrastructure
Results
Fairmont, WV 26554

Paving of Multiple City Streets
Infrastructure
Post-Bid
Mannington, WV 26582

Highway Pollinator Mitigation Site Development and Maintenance
Term Contract, Infrastructure
Results

Beechlick Run Bridge
New Construction, Infrastructure
Results
WV

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

East Fairmont Junior High Improvements
Infrastructure, Alteration
Results
Fairmont, WV

Last Updated 10/11/2022 04:31 AM
Project Title

Hutchinson Truss

Physical Address View project details and contacts
City, State (County) Worthington, WV 26591   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : STP0903001D Type of Work : Replace Structure As of October 11, 2022, the project is in Design status. The funding obligation date for the construction is October 28, 2022. WVDOT - Hutchinson Truss *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents