Similar Projects
Commons Building HVAC - Wake County
Renovation, Alteration
Conception
$325,000 est. value
Raleigh, NC 27610

Replace Air Cooled Chiller
Alteration
Post-Bid
Raleigh, NC

Jordan Hall HVAC Renovation
Alteration
Post-Bid
$700,000 est. value
Raleigh, NC 27695

Rooftop Air Handlers Replacement
Results
$362,139 est. value
Raleigh, NC 27604

The Marbles Kids Museum Imax Theater Chillers Replacement
Results
Raleigh, NC 27601

Broughton High School HVAC Upgrades
Renovation
Construction
$2,374,600 CJ est. value
Raleigh, NC 27605

NCSU - HVAC Renovation Matsumoto Wing - Brooks Hall
Alteration
Post-Bid
$565,000 est. value
Raleigh, NC 27605

Mechanical Equipment Replacement Group 4 - Buildings SJ ILC Renovations
Results
$1,089,489 est. value
Raleigh, NC 27603

Furnace
Alteration
Post-Bid
Raleigh, NC

Wake Forest Middle School HVAC, Fire Alarm and Elevator Upgrades
Results
Wake Forest, NC 27587

NCSU - HVAC Upgrades to Thomas Hall
Alteration
Post-Bid
Raleigh, NC

Chiller
Results
Raleigh, NC

Gas Water Heater and HVAC Venting Replacements
Alteration
Post-Bid
Raleigh, NC 27604

Goraleigh Chiller
Results
Raleigh, NC

State Government Complex Chiller Plant
Alteration
Post-Bid
$21,875,000 est. value
Raleigh, NC

Last Updated 11/17/2022 12:16 PM
Project Title

Eva Perry Regional Library HVAC Replacement Project Phase 2

Physical Address View project details and contacts
City, State (County) Apex, NC 27502   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $412,428 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Labor, material and equipment entering into the construction of the Eva Perry Regional Library HVAC Replacement Project Phase 2, located in 2100 Shepherds Vineyard Drive, Apex, North Carolina 27502. Wake County provides minorities and women equal opportunity to participate in all aspects of its construction program consistent with NCGS 143-8. Bidders shall comply with the requirements of the Wake County Minority Business Enterprise Program, as outlined in the front-end specification section 05 MBE Resolution of the Project Manual. No bid may be withdrawn for ninety (90) days after the scheduled closing time for bids. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents