Similar Projects
RFP Engineering - Perpetuation - Resurfacing
Infrastructure
Conception
$5,000,000 CJ est. value
Kiel, WI 53042

RFP Engineering - Perpetuation - Resurfacing
Infrastructure
Conception
$5,000,000 CJ est. value
Kiel, WI 53042

River Point Riverbank Project
Infrastructure
Design
$240,000 CJ est. value
Manitowoc, WI 54220

2022 Nuclear Road Improvements
Infrastructure
Bidding
$690,000 CJ est. value
Mishicot, WI 54228

2022 Nuclear Road Improvements
Infrastructure
Bidding
$690,000 CJ est. value
Mishicot, WI 54228

Hot Mix Paving
Post-Bid
Reedsville, WI 54230

Pavement Repair
Post-Bid
Cleveland, WI 53015

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Asphaltic Concrete Paving
Results
Manitowoc, WI 54220

Repair SSG Andrew Miller ARC Manitowoc, WI
Addition, Demolition, Infrastructure, Renovation - 17,578 SF
Pending Verification
$9,379,249 CJ est. value
Manitowoc, WI 54220

Repair SSG Andrew Miller ARC Manitowoc, WI
Addition, Demolition, Infrastructure, Renovation - 17,578 SF
Pending Verification
$9,379,249 CJ est. value
Manitowoc, WI 54220

Two Rivers - Kewaunee Const Ops / Cold10 / HSIP
Infrastructure
Conception
$8,000,000 CJ est. value
Manitowoc, WI 54220

Watermain Replacement, Waldo Boulevard Viaduct
Infrastructure
Bidding
$600,000 CJ est. value
Manitowoc, WI 54220

Pulverizing Chip Sealing
Post-Bid
WI

Concrete Paving III (South 30th Street Reconstruction)
Results
Manitowoc, WI 54220

Last Updated 08/22/2022 10:05 AM
Project Title

Resurface Rawley Point Bike Trail

Physical Address View project details and contacts
City, State (County) Two Rivers, WI 54241   (Manitowoc County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $198,723 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of the following: adding compacted limestone screening base, replacing culvert pipes, removing retaining walls, and grading work to the existing Rawley Point bicycle trail.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents