Similar Projects
Eau Claire - Chippewa Falls, Thin Polymer Overlay, Various Highways
Infrastructure
Bidding
$500,000 to $749,999 est. value
Eau Claire, WI 54701

CTH G Reconditioning Eau Claire County
Infrastructure
Bidding
$250,000 est. value
Augusta, WI 54722

Asphalt Reconstruction
Post-Bid
Seymour, WI

Stabilized Full Depth Reclamation
Post-Bid
Altoona, WI

Eau Claire, N. Clairemont Avenue, Sth 312 To County Line Road
Results
Eau Claire, WI 54701

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Polymer Overlay for Concrete Decks
Post-Bid
Altoona, WI

Reconstruction/Resurfacing Bids
Renovation
Results
Alma, WI 54610

Bremer Ridge Road Hot Mix Blacktop
Post-Bid
WI 54612

Fall Creek - NCL, Boardwalk Street to CTH N
Results
Fall Creek, WI 54742

Single Chip Sealing
Post-Bid
Fountain City, WI

C. Chippewa Falls, Seymour Cray SR Blvd., CTH I Intersection
Results
Chippewa Falls, Seymour, WI

Crack Sealing and Chip Sealing of Bridge Creek Road
Infrastructure
Post-Bid
Mondovi, WI

Chayne Drive Recondition
Results
Eau Claire, WI 54703

Asphalt Paving, Crack Sealing, Seal Coating, Chip Sealing, Pulverizing, Pavement Marking and Base Course
Infrastructure
Post-Bid
Eau Claire, WI

Last Updated 04/25/2022 08:26 AM
Project Title

Mondovi - Eau Claire, USH 10 to STH 85

Physical Address View project details and contacts
City, State (County) (Buffalo, Eau Claire Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Buffalo and Eau Claire, Counties; 7110-00-70, WISC 2022 025; STH 37; 15.177 Miles; Excavation, Base, HMA Pavement, Curb and Gutter, Beam Guard, Pavement Marking, and Structure Rehab Excavation Common, 266 CY; Borrow, 4,718 CY; Base Aggregate Dense, 12,012 Ton; Marking Epoxy, 100,650 LF; Construction Staking, 85,106 LF; Construction Staking, 1 LS; Concrete Curb and Gutter, 470 LF; Beam Guard, 2,712 LF; Beam Guard Energy Absorbing Terminals, 37 Each; HMA Pavement, 58,325 Ton; Removing Asphaltic Surface Milling, 276,710 SY; Tack Coat, 36,865 Gals.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents