Similar Projects
Interquest Parkway Parking Lot
New Construction
Design
Colorado Springs, CO 80921

Widefield ADA Improvements (CDBG) Project
Infrastructure
Bidding
CO

Red Rock Canyon Open Space Parking Improvements
Post-Bid
Colorado Springs, CO

Palmer-Mesa Trail Project
Post-Bid
CO

PPRTA Cost Share Concrete
Results
Colorado Springs, CO

Citadel Mall Improvements Project
Results
Colorado Springs, CO

Falcon Highlands Maintenance Project
Post-Bid
Colorado Springs, CO 80903

Shooks Run Trail Resurfacing Project
Results
Colorado Springs, CO 80903

Managed Parking
Post-Bid
Green Mountain Falls, CO

Construction of The Kane Ranch Open Space Project
Results
CO

2020 CDBG Prado Dr and Downtown ADA Improvements
Post-Bid
Fountain, CO 80817

Palmer Lake Library Ramp
Results
Palmer Lake, CO 80133

Fountain Creek at Hanson Trailhead Project
Results
$1,750,000 to $2,100,000 est. value
Colorado Springs, CO 80903

Granite Rock Trailhead Improvements
Results
Less than $50,000 est. value
Colorado Springs, CO 80907

Manitou Avenue from Park Avenue to Serpentine Drive Construction Project
Results
Manitou Springs, CO 80829

Last Updated 09/16/2021 03:35 PM
Project Title

FCF ADA Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The FCF ADA Improvements – Phase 1 project at the Fremont Correctional Facility (FCF) in Canon City, CO project consists of, but is not limited to; field verification, selective demolition, cast-in-place concrete, rough carpentry, masonry, drywall, acoustic ceilings, flooring, cut and patch, with ADA railings, hardware, plumbing fixtures, signage, alarms, etc. and related mechanical, electrical, and fire alarm construction.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents