Similar Projects
Resthaven Assisted Living Facility Septic System
Bidding
Zolfo Springs, FL 33890

Purchase of Fire Hydrants and Fittings
Bidding
Lake City, FL

Rivertown Kendall Drive - Phase 2
New Construction
Post-Bid
Jacksonville, FL

Two (2) Year Contract for Natural Gas Pipeline Cathodic Protection System Service and Maintenance
Term Contract
Post-Bid
Pensacola, FL 32502

Job Order Contracting Services for New Water Meter Service Installations
Term Contract
Results
Tampa, FL 33602

Grace Lane and Sandy Court Water Main and Roadway Improvements
Results
Orange Park, FL

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Dolphin Street and Dolphin Court Utility Roadway Improvements
Bidding
$1,100,000 to $1,150,000 est. value
Orange Park, FL 32073

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Water Treatment Plant Sodium Hypochlorite Tank Replacement
Results
Less than $225,000 est. value
Panama City, FL 32404

Newberry Lane Forcemain Project
Bidding
Newberry, FL 32669

CDBG University Square Water Replacement
Post-Bid
Temple Terrace, FL 33617

Lincoln Park Water and Sewer Improvements
Results
$1,600,000 est. value
Arcadia, FL 34265

Gravity Sewer System Condition Assessment and Renewal and Replacement (Inflow/Infiltration - I/I) Excavated Point Repairs
Post-Bid
Hollywood, FL 33022

Fuel Tank and Cleaning Services
Term Contract
Results
Viera, FL 32940

Last Updated 02/23/2021 04:18 PM
Project Title

Annual Directional Boring

Physical Address View project details and contacts
City, State (County) Milton, FL   (Santa Rosa County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide for a set rate per linear foot for various sizes and types of piping as stated below. The rate will be for all services necessary for making a directional bore only. Contractor shall provide services to the City of Milton for all the City of Milton directional boring needs for water, sewer, and natural gas.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents