Similar Projects
Augusta - Cadott Construction / CIR / Resurface
Infrastructure
Conception
$4,000,000 CJ est. value
Cadott, WI 54727

Augusta - Cadott Construction / CIR / Resurface
Infrastructure
Conception
$4,000,000 CJ est. value
Cadott, WI 54727

Hope Village
New Construction, Renovation, Infrastructure
Design
$10,000,000 CJ est. value
Chippewa Falls, WI 54729

NWC Security System Upgrade - State of Wisconsin - Department of Health Services
Infrastructure
Design
$560,000 CJ est. value
Chippewa Falls, WI 54729

Transit Transfer Center Bid Package No. 3
Renovation, Infrastructure
Post-Bid
Eau Claire, WI

Transit Transfer Center Bid Package No. 3
Renovation, Infrastructure
Post-Bid
Eau Claire, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Baribeau and Johnson Road Improvements
Infrastructure
Results
Cornell, WI 54732

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

Roadway Repaving Lake Wissota State Park
Infrastructure
Pending Verification
$727,350 CJ est. value
Chippewa Falls, WI 54729

WIS 178, Olson Drive Intersection - Wisconsin Department of Transportation
Infrastructure
Conception
$1,400,000 CJ est. value
Chippewa Falls, WI 54729

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Well No. 5 Pump House and Site Improvements
Infrastructure
Results
Lake Hallie, WI

Last Updated 05/09/2023 09:34 AM
Project Title

City of Chippewa Falls 2023 Street and Utility Improvement Projects

Physical Address View project details and contacts
City, State (County) Chippewa Falls, WI 54729   (Chippewa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,643,475 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 9th, 2023 this project has been awarded to Haas Sons Inc. with bid amount of $2,643,474.53** HMA Pavement, Base Aggregate Dense, Granular Backfill, Common Excavation, Concrete Curb and Gutter, Concrete Driveways, Concrete Sidewalk, Sanitary Sewer, Water Main, Sanitary Services, Water Services, Storm Sewer Pre-Qualification: Yes Questions received less than ten days prior to the date for opening of Bids may not be answered

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents