Similar Projects
Highway Reconstruction and Bridge Replacements - Camden - Region 2
Demolition, New Construction, Infrastructure
Post-Bid
$18,892,871 CJ est. value
Camden, ME 04843

2023 Forest Grove Cemetery Mowing Services
Term Contract
Post-Bid
Lebanon, ME 04027

Entryway Steps Replacement Project
Alteration
Results
Houlton, ME 04730

2023 Roadway Paving
Infrastructure
Results
$115,508 CJ est. value
Bowdoinham, ME 04008

2023 Town Properties Mowing Services
Term Contract
Post-Bid
Lebanon, ME 04027

Large Culvert Replacement - Warren, Region 2
Infrastructure
Results
$775,126 CJ est. value
Warren, ME 04864

2023 Prospect Hill Cemetery Mowing Services
Term Contract
Post-Bid
Lebanon, ME 04027

2023 Roadway Improvements - Paris Maine
Infrastructure
Results
$747,659 CJ est. value
South Paris, ME 04281

Headstone Installation
Alteration
Post-Bid
Sanford, ME 04083

Crack Seal, Crack Repair and Mark Airport Pavements
Infrastructure
Results
$73,500 CJ est. value
Kingfield, ME 04947

Concrete Pads at the Swanville Transfer Station
Alteration
Post-Bid
$50,000 est. value
Monroe, ME 04951

Crack Seal / Repair and Marking Runway 14-32
Infrastructure
Results
$79,165 CJ est. value
Greenville, ME 04441

New Patios at Woodman Heights
Alteration
Post-Bid
$175,000 to $250,000 est. value
Waterville, ME

MSAD 51 Cafeteria Mechanical Upgrades
Renovation
Results
$372,497 CJ est. value
Cumberland Center, ME 04021

2022-2023 Crack Sealing
Infrastructure
Post-Bid
$40,000 CJ est. value
Buxton, ME 04093

Last Updated 05/15/2023 10:37 AM
Project Title

Construction of Two (2) Dual Electric Vehicle (EV) Charging Stations

Physical Address View project details and contacts
City, State (County) Brewer, ME 04412   (Penobscot County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Abandoned, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $90,480 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 15, 2023, project was not awarded. Project is no longer needed. Bids are requested for the construction of two (2) dual Electric Vehicle (EV) charging stations at 2 separate locations within the City of Brewer. The project includes the installation of two black aluminum poles, associated foundations and conduit. Installation of EV chargers and associ Scope Site work and new constructated equipment to provide functioning charger units with software installed and ready for use by City staff at the completion of the project. For consideration, the attached bid form must be sealed in an envelope, distinctly marked, 2023 EV Charging Station Installation Project The work shall not commence until such time as the Contractor receives a notice to proceed from the City Engineer or his designee. The work is expected to begin on or about March 20, 2023 and be completed by July 31, 2023. The City of Brewer, Maine holds the exclusive right to reject or accept all or part of any or all bids received.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents