Similar Projects
Corrugated Metal Pipe
Term Contract
Design
Richmond, VA 23219

Brine Tank Maintenance
Term Contract
Design
Richmond, VA 23219

Temporary Steel Repairs
Term Contract
Sub-Bidding
Richmond, VA 23219

Downtown Transfer Station and Transit Oriented Development Study
Term Contract
Sub-Bidding
Richmond, VA 23219

Pest Control-Bed Bugs Services
Term Contract
Post-Bid
Richmond, VA

Pressure Washing - Tidewater Community College
Term Contract
Post-Bid

Sweeping and Power Washing for Science Museum Parking Deck
Term Contract
Results
Richmond, VA 23220

Indefinite Delivery-Indefinite Quantity Construction Contracts
Term Contract
Sub-Bidding
Richmond, VA 23219

CCA Treated Bridge Timbers
Term Contract
Post-Bid
Louisa, VA 23093

Snow and Ice Removal Services 2023
Term Contract
Sub-Bidding
Richmond, VA 23219

Biosolid Waste Disposal Services
Term Contract
Post-Bid
Richmond, VA 23219

RMTA Snow & Ice Removal Services 2023
Term Contract
Sub-Bidding
Richmond, VA 23219

Wooden Crossties for a Tie Upgrade Project on the Richmond and Alleghany Division
Term Contract
Post-Bid
Dillwyn, VA 23936

Water Heaters, Boilers, and Parts
Term Contract
Post-Bid
Richmond, VA 23219

Operations and Preventative Maintenance Services for Movable Bridges - Richmond District
Term Contract
Post-Bid
Richmond, VA 23219

Last Updated 06/16/2023 08:03 AM
Project Title

Stromwater Maintenance Services

Physical Address View project details and contacts
City, State (County) Richmond, VA 23224   (Richmond City County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All vehicle maintenance, fueling, and washing is performed under the roof. Filterra bioretention is installed in storm water drainage pipes to improve storm water quality. In areas of potential pollution, the stormwater inlets are equipped with filters. There is one 5,000 gallon 2-stage inground oil/water separator that is in front of repair bay 9. Vehicle wash water and discharge from the shop floor drains to the oil/water separator and then is discharged to the sanitary sewer. The engine steam clean sump is pumped out quarterly via a contractor.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents