Similar Projects
Galvanized Corrugated Steel Pipe
Post-Bid
Edwardsville, IL

Precoated Galvanized Corrugated Steel Pipe
Post-Bid
Edwardsville, IL

Miner Park Judy's Branch Bank Stabilization
Results
Less than $29,010 est. value
Carbondale, Glen Carbon, IL 62034

Flood Repair at the Grey-s Farm Pump Station; Frontage Road a, West of i-255 and North of Horseshoe Lake Road
Results
Collinsville, IL 62234

Cemetery Road Drainage Improvement
Post-Bid
Worden, IL 62097

2021 Pavement Marking
Results
$25,000 to $35,000 est. value
Edwardsville, IL

Country Lane Resurfacing and Culvert Replacement
Infrastructure
Post-Bid
Troy, IL 62294

Discharge Box Culvert Replacement at the Collinsville Pump Station
Infrastructure
Results
Collinsville, IL

Silver Lake Spillway Retaining Wall Replacement
Infrastructure
Post-Bid
Highland, IL 62249

Removing Damaged Raised Reflective Pavement Markers and Perplacing Them With New Raised Reflective Pavement Markers Within the Limits Shown in the Plans
Infrastructure
Results

Madison Avenue Drainage Improvements
Infrastructure
Post-Bid
Granite City, IL

Guardrail and Cable Median Repair at Various locations in District 8
Infrastructure
Results

Precoated Galvanized Corrugated Steel Pipe
Term Contract
Post-Bid
Edwardsville, IL

CCTV Inspection of Gravity Drains
Infrastructure
Results
Wood River, IL 62095

Relief Well Package #3 - Lower Wood River Drainage and Levee District
Term Contract, Alteration
Post-Bid
$5,000,000 to $10,000,000 est. value
IL

Last Updated 04/27/2022 02:47 PM
Project Title

Wenzel Road Culvert Replacement - Guardrail Installation

Physical Address View project details and contacts
City, State (County) Godfrey, IL 62035   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install a new guardrail along the north and south side of Wenzel Road after the roadway pavement is restored. The guardrail installation will be the final portion of work for the Wenzel Road Culvert Replacement Project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents